Parking Brake Switch Circuit (From 08/2009): Procedure
- READ VALUE USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Main Body / Data List.
- Read the display on the Techstream.MAIN BODY
Tester Display Measurement Item/Range Normal Condition Parking Brake SW Parking brake switch signal/ON or OFF ON: Parking brake switch on
OFF: Parking brake switch offOK
Normal conditions listed above are displayed.
NG → See step 2
OK → See step 5
- INSPECT PARKING BRAKE SWITCH ASSEMBLY
- Remove the parking brake switch assembly. Refer to COMPONENTS .
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 1 - Switch body Shaft pushed in (OFF) 10 kΩ or higher 1 - Switch body Shaft not pushed in (ON) Below 1 Ω
NG → See step 6
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (SWITCH - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
- Disconnect the 2F instrument panel junction block assembly connector.
- Disconnect the A49 parking brake switch assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition A49-1 - 2F-32 Always Below 1 Ω A49-1 - Body ground Always 10 kΩ or higher TEXT IN ILLUSTRATION*1 Front view of wire harness connector
(to Instrument Panel Junction Block Assembly)*2 Front view of wire harness connector
(to Parking Brake Switch Assembly)
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Remove the instrument panel junction block assembly.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 2F-32 - A-12 (PKB) Always Below 1 Ω 2F-32 - Body ground Always 10 kΩ or higher TEXT IN ILLUSTRATION*1 Component without harness connected
(Instrument Panel Junction Block Assembly)
NG → REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
OK → See step 7
- PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE
- REPLACE PARKING BRAKE SWITCH ASSEMBLY. Refer to COMPONENTS
- REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to COMPONENTS