Front Fog Light Circuit (To 08/2009): Procedure
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Main Body / Active Test.
- Check that the relay operates.MAIN BODY
Tester Display Test Part Control Range Front Fog Light Relay Front fog light relay ON/OFF OK
Front fog light relay operates. (Front fog lights come on.)
NG → See step 2
OK → See step 4
- CHECK OPERATION (TAILLIGHTS)
- Check the operation of the taillights.
OK
Taillights operate normally.
NG → See step 5
OK: Go to next step
- Check the operation of the taillights.
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Remove the instrument panel junction block assembly.
- Connect a positive (+) lead from the battery to terminal 2K-1.
- Connect a negative (-) lead from the battery to terminals A-14 and A-13.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition 2F-9 - Battery negative Always 11 to 14 V 2F-10 - Battery negative Always 11 to 14 V TEXT IN ILLUSTRATION*1 Component without harness connected
(Instrument Panel Junction Block Assembly)
NG → REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
OK → See step 6
- PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE
- GO TO PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE
- REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to COMPONENTS