Inspection Procedure: Procedure
WARNING: This page is about a different car, the 2010 Lexus IS 250. However, it is still accessible from the selected car via links, so may be relevant.
- INSPECT TRANSMISSION WIRE (SR)
- Disconnect the transmission wire connector from the transmission.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition
20°C (68°F)6 - Body ground 11 to 15 Ω
NG → See step 3
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - ECM)
- Connect the transmission connector to the transmission.
- Disconnect the connector from the ECM.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition
20°C (68°F)E4-2 (SR) - Body ground 11 to 15 Ω
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK → REPLACE ECM
- INSPECT SHIFT SOLENOID VALVE SR
- Remove the shift solenoid valve SR.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition
20°C (68°F)Solenoid Connector (SR) - Solenoid Body (SR) 11 to 15 Ω - Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.
OK
The solenoid makes an operating sound.
NG → REPLACE SHIFT SOLENOID VALVE SR
OK → REPAIR OR REPLACE TRANSMISSION WIRE