LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2010 >> HS 250h >> Repair and Diagnosis >> Accessories & Equipment >> Exterior Lights >> Lighting (Exterior) (Diagnostic Codes & Circuit Tests) >> Lighting System >> Back-up Light Circuit >> Procedure

Back-up Light Circuit: Procedure

  1. CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - BATTERY AND BODY GROUND) 
    1. Disconnect the 1G and 1H No. 2 integration relay connectors.
    2. Measure the voltage and resistance according to the value(s) in the table below.

      Standard Voltage

      Tester Connector Condition Specified Condition
      1G-14 (IG1) - Body ground Power switch on (IG) 11 to 14 V
      1H-7 (BATT) - Body ground Power switch off 11 to 14 V

      Standard Resistance

      Tester Connection Condition Specified Condition
      1H-3 (GND2) - Body ground Always Below 1 Ω
      1G-22 (GND1) - Body ground Always Below 1 Ω

    NG → REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK: Go to next step 

  2. CHECK HARNESS AND CONNECTOR (NO. 2 INTEGRATION RELAY - HYBRID VEHICLE CONTROL ECU) 
    1. Disconnect the 1G No. 2 integration relay connector.
    2. Disconnect the A58 hybrid vehicle control ECU connector.
    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      1G-13 (BKUP) - A58-16 (BL) Always Below 1 Ω
      1G-13 (BKUP) - Body ground Always 10 kΩ or higher

    NG → REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK: Go to next step 

  3. CHECK HARNESS AND CONNECTOR (REAR COMBINATION LIGHT ASSEMBLY - RELAY AND BODY GROUND) 
    1. Disconnect the 1G No. 2 integration relay connector.
    2. Disconnect the L29 or L28 rear combination light assembly connector.
    3. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      1G-3 (BCK1) - L29-2 (B/U) Always Below 1 Ω
      1G-3 (BCK1) - L28-2 (B/U) Always Below 1 Ω
      1G-3 (BCK1) - Body ground Always 10 kΩ or higher
      L29-3 (E) - Body ground Always Below 1 Ω
      L28-3 (E) - Body ground Always Below 1 Ω

    NG → REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK: Go to next step 

  4. REPLACE NO. 2 INTEGRATION RELAY 
    1. Temporarily replace the No. 2 integration relay with a new or normally functioning one. Refer to COMPONENTS .
    2. Check that the back-up lights operate normally.

      OK

      The back-up lights operate normally.

    NG → See step   5 

    OK → END 

  5. PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to  PROBLEM SYMPTOMS TABLE