Entire Combination Meter does not Operate: Procedure
- INSPECT COMBINATION METER ASSEMBLY
- Disconnect the C8 and C9 connectors.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Condition Specified Condition C8-1 (POWER GND)
- Body groundAlways Below 1 Ω C9-1 (SIGNAL GND)
- Body groundAlways Below 1 Ω - Measure the voltage according to the value(s) in the table below.
Standard voltage
Tester Connection Condition Specified Condition C8-8 (IG2) -
Body groundTurn the ignition switch to the ON position. 10 to 16 V C8-15 (ECU +B)
- Body groundAlways 10 to 16 V C8-16 (DOME +B)
- Body groundAlways 10 to 16 V
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK → REPLACE COMBINATION METER ASSEMBLY