LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2009 >> IS F V8-5.0L (2UR-GSE) >> Repair and Diagnosis >> Powertrain Management >> Emission Control Systems >> Evaporative Emissions System >> Canister Purge Control Valve >> Service and Repair >> Installation

Installation








2UR-GSE EMISSION CONTROL: PURGE VALVE: INSTALLATION

INSTALLATION

1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
HINT: The No. 1 vacuum switching valve assembly is the purge valve.





(a) Install the No. 1 vacuum switching valve assembly with the bolt.
Torque: 21 Nm (214 kgf-cm, 15 ft-lbf)
(b) Connect the fuel vapor feed hose and No. 2 fuel vapor feed hose to the No. 1 vacuum switching valve assembly.
(c) Connect the No. 1 vacuum switching valve assembly connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation