DTC P2799-859: Auxiliary Transmission Fluid Pump Control Circuit High: Procedure
- CHECK OIL PUMP MOTOR CONTROLLER
- Turn the power switch off.
- Disconnect connector A55 from the oil pump motor controller.
- Turn the power switch on (IG).
- Measure the voltage according to the value(s) in the table below.
Standard voltage
Tester Connection Specified Condition +B (A55-5) - Body ground 10 to 14 V NOTE:Turning the power switch on (IG) with the oil pump motor controller connector disconnected causes other DTCs to be stored. Clear the DTCs after performing this inspection.
NG → See step 7
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (HYBRID VEHICLE CONTROL ECU - OIL PUMP MOTOR CONTROLLER)
- Disconnect connector A54 from the hybrid vehicle control ECU.
- Disconnect connector A55 from the oil pump motor controller.
- Turn the power switch on (IG).
- Measure the voltage according to the value(s) in the table below.
Standard voltage
Tester Connection Specified Condition OPST (A54-2) - Body ground Below 1 V NOTE:Turning the power switch on (IG) with the hybrid vehicle control ECU connector disconnected causes other DTCs to be stored. Clear the DTCs after performing this inspection.
- Turn the power switch off.
- Measure the resistance according to the value(s) in the table below.
Standard resistance (Check for open)
Tester Connection Specified Condition OPST (A54-2) - OPST (A55-7) Below 1 Ω Standard resistance (Check for short)
Tester Connection Specified Condition OPST (A54-2) or OPST (A55-7) - Body ground 10 kΩ or more
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- CHECK HYBRID VEHICLE CONTROL ECU
- Turn the power switch off.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition OPST (A54-2) - +B1 (A54-46) 6.5 to 8.5 kΩ
NG → See step 13
OK: Go to next step
- CLEAR DTC (HV)
- Connect the Techstream to the DLC3.
- Turn the power switch on (IG).
- Read and record the DTCs and freeze frame data.
- Select the following menu items: Powertrain / Hybrid Control / Trouble Codes.
- Clear the DTCs.
NEXT: Go to next step
- RECONFIRM DTC OUTPUT (HV)
- Connect the Techstream to the DLC3.
- Turn the power switch on (IG).
- Select the following menu items: Powertrain / Hybrid Control / Trouble Codes.
- Read output DTCs.
Result
DTC P2799-859 is output.
YES → See step 13
NO: Go to next step
- CHECK FOR INTERMITTENT PROBLEMS
- Check for intermittent problems. Refer to CHECK FOR INTERMITTENT PROBLEMS .
YES → REPAIR OR REPLACE MALFUNCTIONING PARTS, COMPONENT AND AREA
NO → See step 14
- CHECK FUSIBLE LINK (OIL PMP)
- Check that there is no open circuit in the fusible link (OIL PMP) in the engine room R/B No. 1.
OK
There is no open circuit in the fusible link (OIL PUMP).
NG → REPLACE FUSIBLE LINK
OK: Go to next step
- Check that there is no open circuit in the fusible link (OIL PMP) in the engine room R/B No. 1.
- CHECK HARNESS AND CONNECTOR (BATTERY - ENGINE ROOM R/B NO. 1)
- Turn the power switch off.
- Remove the OIL PMP relay from the engine room R/B No. 1.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition Engine room R/B No. 1 OIL PMP relay terminal 3 - +B (A55-5) Below 1 Ω Engine room R/B No. 1 OIL PMP relay terminal 3 - Body ground 10 kΩ or more - Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition Engine room R/B No. 1 OIL PMP relay terminal 2 - Body ground Below 1 Ω
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- INSPECT RELAY (OIL PMP)
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition 1 - 2 151 to 203 Ω 3 - 5 10 kΩ or more 3 - 5 Below 1 Ω
(Apply battery voltage between 1 and 2)
NG → REPLACE RELAY (OIL PMP)
OK: Go to next step
- Measure the resistance according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (ENGINE ROOM R/B NO. 1 - BODY GROUND)
- Turn the power switch on (IG).
- Measure the voltage according to the value(s) in the table below.
Standard voltage
Tester Connection Specified Condition Engine room R/B No. 1 OIL PMP relay terminal 5 - Body ground 10 to 14 V
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- CHECK HYBRID VEHICLE CONTROL ECU
- Turn the power switch on (IG).
- Measure the voltage according to the value(s) in the table below.
Standard voltage
Tester Connection Specified Condition Engine room R/B No. 1 OIL PMP relay terminal 1 - Body ground 10 to 14 V
OK → CHECK FOR INTERMITTENT PROBLEMS
NG: Go to next step
- CHECK HARNESS AND CONNECTOR (HYBRID VEHICLE CONTROL ECU - ENGINE ROOM R/B NO. 1)
- Turn the power switch off.
- Disconnect connector A54 from the hybrid vehicle control ECU.
- Measure the resistance according to the value(s) in the table below.
Standard resistance (Check for open)
Tester Connection Specified Condition OPM2 (A54-58) - Engine room R/B No. 1 OIL PMP relay terminal 1 Below 1 Ω Standard resistance (Check for short)
Tester Connection Specified Condition OPM2 (A54-58) or Engine room R/B No. 1 OIL PMP relay terminal 1 - Body ground 10 kΩ or more
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR
OK → See step 13
- REPLACE HYBRID VEHICLE CONTROL ECU. Refer to COMPONENTS
- REPLACE OIL PUMP MOTOR CONTROLLER. Refer to COMPONENTS