LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2009 >> GS 350 RWD >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter (Service Information) >> Combination Meter >> Installation >> Installation

Combination Meter: Installation: Installation

  1. INSTALL COMBINATION METER GLASS 
    1. Install the glass and engage the 7 claws.
      Fig 1: Identifying Glass Claws
      GTY106260Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the combination meter glass's wire harness with the clamps.
      Fig 2: Identifying Combination Meter Glass Wire Harness With Clamps
      GTY106261Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Connect the 3 connectors.
      Fig 3: Locating Combination Meter Connectors
      GTY101121Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Close the cover.
      Fig 4: Closing Cover And Attaching Claws
      GTY106262Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    5. Engage the 2 claws.
  2. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect the connector.
      Fig 5: Locating Combination Meter Mounting Screws
      GTY100446Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the combination meter assembly with the 4 screws.
  3. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY 
    1. Connect the connector.
      Fig 6: Connecting Connector
      GTY101591Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Engage the 5 clips to install the instrument cluster finish panel sub-assembly.
  4. INSTALL UPPER STEERING COLUMN COVER 

    for 2GR-FSE:. Refer to INSTALLATION - Step 9

    for 1UR-FSE. Refer to INSTALLATION - Step 10

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Refer to INITIALIZATION .