LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2008 >> RX 350 FWD >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter >> Meter / Gauge System >> Entire Combination Meter does not Operate >> Inspection Procedure

Inspection Procedure

  1. INSPECT COMBINATION METER ASSEMBLY 
    1. Disconnect the C8 and C9 connectors.
    2. Measure the resistance according to the value (s) in the table below.

      Standard resistance 

      RESISTANCE REFERENCE CHART

      Tester Connection Condition Specified Condition
      C8-1 (POWER GND) - Body ground Always Below 1 Ω
      C9-1 (SIGNAL GND) - Body ground Always Below 1 Ω
      Fig 1: Identifying Combination Meter Assembly
      G05204537Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Measure the voltage according to the value (s) in the table below.

      Standard voltage 

      VOLTAGE SPECIFICATION

      Tester Connection Condition Specified Condition
      C8-8 (IG2) -Body ground Turn the ignition switch to the ON position. 10 to 16 V
      C8-15 (ECU +B) - Body ground Always 10 to 16 V
      C8-16 (DOME +B) - Body ground Always 10 to 16 V

    NG: REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK: REPLACE COMBINATION METER ASSEMBLY