Inspection Procedure
WARNING: This page is about a different variant/trim than selected.
- INSPECT TRANSMISSION WIRE (SLU)
- Disconnect the transmission wire connector from the transmission.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Specified Condition 20°C (68°F) 12 (SLU+) - 4 (SLU-) 5.0 to 5.6 Ω - Measure the resistance according to the value(s) in the table below.
Standard resistance (Check for short)
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Specified Condition 12 (SLU+) - Body ground 10 kΩ or higher 4 (SLU-) - Body ground ↑
NG: Go to step 3
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - ECM)
- Connect the transmission wire connector to the transmission.
- Disconnect the ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Specified Condition 20°C (68°F) E4-13 (SLU+) - E4-12 (SLU-) 5.0 to 5.6 Ω - Measure the resistance according to the value(s) in the table below.
Standard resistance (Check for short)
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Specified Condition E4-13 (SLU+) - Body ground 10 kΩ or higher E4-12 (SLU-) - Body ground ↑
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE ECM
- INSPECT SHIFT SOLENOID VALVE SLU
- Remove the shift solenoid valve SLU.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Specified Condition 20°C (68°F) 1 - 2 5.0 to 5.6 Ω - Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the valve.
OK:
The solenoid makes an operating sound.
NG: REPLACE SHIFT SOLENOID VALVE SLU