Inspection Procedure
HINT:
Read freeze frame data using the intelligent tester. Freeze frame data records the engine conditions when malfunctions are detected. When troubleshooting, freeze frame data can help determine if the vehicle was running or stopped, if the engine was warmed up or not, if the air fuel ratio was lean or rich, and other data from the time the malfunction occurred.
- CHECK ANY OTHER DTCS OUTPUT (IN ADDITION TO SECONDARY AIR INJECTION SYSTEM DTCS)
- Connect the intelligent tester to the CAN VIM. Then connect the CAN VIM to the DLC3.
- Turn the ignition switch ON and turn the tester ON.
- Enter the following menus: DIAGNOSIS / ENHANCED OBD II / DTC INFO / CURRENT CODES.
- Read DTCs.
Result
RESULT REFERENCEDisplay (DTC Output) Proceed To "P1441 and/or P1444" and P2440 A P1441 and/or P1444 B "P1441 and/or P1444 and/or P2440" and other DTCs C HINT:
If any DTCs other than P1441, P1444 or P2440 are output, troubleshoot those DTCs first.
B: Go to step 7
C: GO TO DTC CHART
A: Go to next step
- CHECK AIR SWITCHING VALVE (OPERATION)
- Remove the intake manifold (see REMOVAL ).
- Remove the Air Switching Valve (ASV).
- Blow air into port A and check that air is not discharged from port B.
OK:
Not discharged
- Apply battery positive voltage across the terminals.
- Blow air into port A and check that air is discharged from port B.
OK:
Discharged
NG: REPLACE AIR SWITCHING VALVE
OK: Go to next step
- CHECK AIR SWITCHING VALVE (VOLTAGE)
- Remove the intake manifold (see REMOVAL ).
- Disconnect the A59 ASV connector.
- Turn the ignition switch ON.
- Measure the voltage between terminal 1 of the air switching valve connector and body ground.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Specified Condition A59-1 - Body ground Below 1.0 V - Reconnect the ASV connector.
NG: Go to step 4
OK: CHECK FOR INTERMITTENT PROBLEMS
- CHECK HARNESS AND CONNECTOR (AIR INJECTION CONTROL DRIVER - AIR SWITCHING VALVE)
- Check the harness and connector (see ELECTRONIC CIRCUIT INSPECTION PROCEDURE ).
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- CHECK AIR INJECTION CONTROL DRIVER (VOLTAGE)
- Disconnect the A56 Air Injection Control Driver (AID) connector.
- Turn the ignition switch ON.
- Measure the voltage between terminal 3 (SIV) of the AID connector and body ground.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Specified Condition A56-3 (SIV) - Body ground 10 V or more - Reconnect the AID connector.
NG: Go to step 6
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK: REPLACE AIR INJECTION CONTROL DRIVER
- CHECK HARNESS AND CONNECTOR (AIR INJECTION CONTROL DRIVER - ECM)
- Check the harness and connector (see ELECTRONIC CIRCUIT INSPECTION PROCEDURE ).
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE ECM
- CHECK NO. 2 AIR SWITCHING VALVE (OPERATION)
- Start the engine and warm it up.
- Turn the ignition switch OFF.
- Connect the intelligent tester to the CAN VIM. Then connect the CAN VIM to the DLC3.
- Start the engine and push the intelligent tester main switch ON.
- Enter the following menus: DIAGNOSIS / ENHANCED OBD II / SYSTEM CHECK / AIR INJ CHECK / MANUAL / OPERATION 5 and 6.
HINT:
OPERATION 5: AP: ON; EASV: OPEN; ASV1: OPEN; ASV2: CLOSE
OPERATION 6: AP: ON; EASV: OPEN; ASV1: CLOSE; ASV2: OPEN
NOTE:- This test only allows technicians to operate the Al system for 5 seconds. Furthermore, the test can be performed 4 times a trip. If the test is repeated, intervals of at least 30 seconds are required between tests.
While the Al system operation using the intelligent tester is prohibited, the tester displays the prohibition (WAIT or ERROR). If ERROR (Al STATUS NG) is displayed on the tester, stop the engine for 10 minutes and then try again.
- When performing the AIR INJ CHECK operation after the battery cable has been reconnected, wait for 7 minutes with the ignition switch turned ON or the engine running.
- Turn the ignition switch OFF when the AIR INJ CHECK operation finishes.
- This test only allows technicians to operate the Al system for 5 seconds. Furthermore, the test can be performed 4 times a trip. If the test is repeated, intervals of at least 30 seconds are required between tests.
- Read values of the A/F BANK1 and BANK2 on the intelligent tester.
Result
RESULT REFERENCEAir switching valve No. 2 operation Air fuel ratio Open 18 or more Closed Approximately 14.5 HINT:
- When the No. 2 ASV operates normally, the A/F value is 18 or more when the valve is open, and approximately 14.5 when the valve is closed.
- Perform the following procedures only on the bank of which the valve is not closed.
- CHECK VSV (FOR AIR INJECTION SYSTEM)
- Turn the ignition switch OFF.
- Disconnect the vacuum hose from the VSV for air injection system.
- Connect the intelligent tester to the CAN VIM. Then connect the CAN VIM to the DLC3.
- Start the engine and turn the tester ON.
- Enter the following menus: DIAGNOSIS / ENHANCED OBD II / SYSTEM CHECK / AIR INJ CHECK / MANUAL /OPERATION 1.
- At this time, check that no negative pressure generates at port A of the VSV.
HINT:
OPERATION 1: AP: OFF; EASV: CLOSE; ASV1: CLOSE; ASV2: CLOSE
NOTE:- This test only allows technicians to operate the Al system for 5 seconds. Furthermore, the test can be performed 4 times a trip. If the test is repeated, intervals of at least 30 seconds are required between tests.
While the Al system operation using the intelligent tester is prohibited, the tester displays the prohibition (WAIT or ERROR). If ERROR (Al STATUS NG) is displayed on the tester, stop the engine for 10 minutes and then try again.
- When performing the AIR INJ CHECK operation after the battery cable has been reconnected, wait for 7 minutes with the ignition switch turned ON or the engine running.
- Turn the ignition switch to OFF when the AIR INJ CHECK operation finishes.
OK:
No negative pressure is generated.
- This test only allows technicians to operate the Al system for 5 seconds. Furthermore, the test can be performed 4 times a trip. If the test is repeated, intervals of at least 30 seconds are required between tests.
- Reconnect the vacuum hose.
NG: Go to step 10
OK: Go to next step
- CHECK NO. 2 AIR SWITCHING VALVE (OPERATION)
- Remove the No. 2 air switching valve.
- Blow air into port B and check that air is not discharged from port C.
OK:
Not discharged from port C
- Apply vacuum 30 kPa (225 mmHg) to port A, blow air into port B and check that air is discharged from port C.
OK:
Discharged from port C
NG: REPLACE NO. 2 AIR SWITCHING VALVE
OK: CHECK FOR INTERMITTENT PROBLEMS
- CHECK VSV (FOR AIR INJECTION SYSTEM)
- Disconnect the 2 vacuum hoses.
- Disconnect the VSV for air injection system connector.
- Blow air into port B and check that air does not flow from port A.
OK:
Air does not flow from port A
- Apply battery positive voltage across the terminals. Then blow air into port B and check that air flows from port A.
OK:
Air flows from port A
NG: REPLACE VSV
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (ECM - VSV FOR AIR INJECTION SYSTEM)
- Check harness and connector (see ELECTRONIC CIRCUIT INSPECTION PROCEDURE ).
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE ECM