LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2006 >> RX 400h FWD >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter >> Meter / Gauge System >> Entire Combination Meter does not Operate >> Inspection Procedure

Inspection Procedure

  1. INSPECT COMBINATION METER ASSEMBLY 
    1. Disconnect the C8 and C9 connectors.
    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance 

      COMBINATION METER ASSEMBLY RESISTANCE

      Tester Connection Condition Specified Condition
      C8-1 (POWER GND) - Body ground Always Below 1 Ω
      C9-1 (SIGNAL GND) - Body ground Always Below 1 Ω
      Fig 1: Inspecting Combination Meter Assembly
      G04115382Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Measure the voltage according to the value(s) in the table below.

      Standard Voltage 

      COMBINATION METER ASSEMBLY VOLTAGE

      Tester Connection Condition Specified Condition
      C8-8 (IG2) - Body ground Ignition switch ON 10 to 16 V
      C8-15 (ECU +B) - Body ground Always 10 to 16 V
      C8-16 (DOME +B) - Body ground Always 10 to 16 V

    NG : REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK : REPLACE COMBINATION METER ASSEMBLY