LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2006 >> IS 250 RWD, Standard >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (Automatic Transmission (A960E)) >> Shift Solenoid Valve >> Inspection

Shift Solenoid Valve: Inspection

WARNING: This page is about a different variant/trim than selected.
  1. INSPECT SHIFT SOLENOID VALVE SL1 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      1 - 2 5.0 to 5.6 Ω
      Fig 1: Checking Resistance Between Shift Solenoid Valve SL1 Terminals
      G04046288Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the operation of the valve.

      OK: 

      The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve SL1.

  2. INSPECT SHIFT SOLENOID VALVE S1 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      Solenoid Connector (S1) - Solenoid Body (S1) 11 to 15 Ω
      Fig 2: Checking Resistance Between Shift Solenoid Valve S1 Terminal And Solenoid Body
      G04046289Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, then check the operation of the valve.

      OK: 

      The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve S1.

  3. INSPECT SHIFT SOLENOID VALVE S2 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      Solenoid Connector (S2) - Solenoid Body (S2) 11 to 15 Ω
      Fig 3: Checking Resistance Between Shift Solenoid Valve S2 Terminal And Solenoid Body
      G04046290Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.

      OK: 

      The solenoid makes an operating noise. 

      If the resistance is not within the specified range, replace the shift solenoid valve S2.

  4. INSPECT SHIFT SOLENOID VALVE S3 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      Solenoid Connector (S3) - Solenoid Body (S3) 11 to 15 Ω
      Fig 4: Checking Resistance Between Shift Solenoid Valve S3 Terminal And Solenoid Body
      G04046291Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body, then check the operation of the valve.

      OK: 

      The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve S3.

  5. INSPECT SHIFT SOLENOID VALVE S4 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      Solenoid Connector (S4) - Solenoid Body (S4) 11 to 15 Ω
      Fig 5: Checking Resistance Between Shift Solenoid Valve S4 Terminal And Solenoid Body
      G04046292Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.

      OK: 

      The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve S4.

  6. INSPECT SHIFT SOLENOID VALVE SL2 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      1 - 2 5.0 to 5.6 Ω
      Fig 6: Checking Resistance Between Shift Solenoid Valve SL2 Terminals
      G04046293Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the operation of the valve.

      OK: 

      The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve SL2.

  7. INSPECT SHIFT SOLENOID VALVE SR 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      Solenoid Connector (SR) - Solenoid Body (SR) 11 to 15 Ω
      Fig 7: Checking Resistance Between Shift Solenoid Valve SR Terminal And Solenoid Body
      G04046294Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the positive (+) lead to the terminal of the solenoid valve connector, and the negative (-) lead to the solenoid body, then check the operation of the valve.

      OK: 

      The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve SR.

  8. INSPECT SHIFT SOLENOID VALVE SLT 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      1 - 2 5.0 to 5.6 Ω
      Fig 8: Checking Resistance Between Shift Solenoid Valve SLT Terminals
      G04046295Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the operation of the valve.

      OK: 

      The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve SLT.

  9. INSPECT SHIFT SOLENOID VALVE SLU 
    1. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Specified Condition 20°C (68°F)
      1 - 2 5.0 to 5.6 Ω
      Fig 9: Checking Resistance Between Shift Solenoid Valve SLU Terminals
      G04046296Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the positive (+) lead with a 21 W bulb to terminal 2 and the negative (-) lead to terminal 1 of the solenoid valve connector, then check the operation of the valve.

      OK: 

      The solenoid makes an operating sound. 

      If the resistance is not within the specified range, replace the shift solenoid valve SLU.