SKID CONTROL ECU (w/ ECB): Installation
- INSTALL SKID CONTROL ECU ASSEMBLY
- Connect the 3 connectors and press the lock levers down to lock the connectors.NOTE: Make sure that the lock levers securely lock the connectors.
- Install the skid control ECU assembly with the 3 bolts.
Torque: 17 N*m (173 kgf*cm, 12 ft.*lbf)
- Connect the connector.
- Connect the 3 connectors and press the lock levers down to lock the connectors.
- INSTALL ENGINE ROOM SIDE COVER LH (See INSTALLATION )
- CONNECT BATTERY CABLE TO BATTERY NEGATIVE TERMINAL
- CHECK AND CLEAR DTC
(See DIAGNOSIS SYSTEM )
- PERFORM INITIALIZATION
(See INITIALIZATION )
Some systems need initialization after reconnecting the cable to the negative battery cable.