Inspection Procedure
WARNING: This page is about a different car, the 2005 Toyota Sienna. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK HARNESS AND CONNECTOR (SKID CONTROL ECU - ECM)
- NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
- OK: GO TO NEXT STEP.
- INSPECT ECM TERMINAL VOLTAGE (NEO TERMINAL)
- Disconnect the brake actuator connector.
- Measure the voltage between the terminal NEO of the skid control ECU and body ground under the engine conditions below.
OK:
VOLTAGE REFERENCEEngine condition Voltage OFF (Ignition switch ON) 3 to 6 V or below 1 V ON (Idling) 3 to 6 V <--> below 1 V (Pulse) - NG: CHECK AND REPLACE ECM
- OK: IF THE SAME CODE IS STILL OUTPUT AFTER THE DTC IS DELETED, CHECK THE CONTACT CONDITION OF EACH CONNECTION