Inspection Procedure
WARNING: This page is about a different car, the 2005 Toyota Sienna. However, it is still accessible from the selected car via links, so may be relevant.
- INSPECT DLC3 TERMINAL VOLTAGE (TC TERMINAL)
- Turn the ignition switch ON.
- Measure the voltage between terminals TC and CG of the DLC3.
OK: 10 to 14 V
- NG: Go to step 4
- OK: Go to next step
- CHECK HARNESS AND CONNECTOR (DLC3 - ECM)
- Check for an open or short circuit in harness and connector between terminal TC of the ECM and DLC3 (See ELECTRONIC CIRCUIT INSPECTION PROCEDURE ).
- NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
- OK: Go to next step
- CHECK HARNESS AND CONNECTOR (BODY GROUND - DLC3)
- Check for an open circuit in harness and connector between terminal CG of the DLC3 and body ground (See ELECTRONIC CIRCUIT INSPECTION PROCEDURE ).
- NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
- OK: Go to next step
- CHECK HARNESS AND CONNECTOR (ECM - SKID CONTROL ECU)
- Check for an open or short circuit in harness and connector between terminal ENG+ and ENG- of the skid control ECU and terminal ENG+ and ENG- of the ECM (See ELECTRONIC CIRCUIT INSPECTION PROCEDURE ).
- NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
- OK: REPLACE ABS & TRACTION ACTUATOR ASSY (See REPLACEMENT )