Inspection Procedure
- INSPECT BATTERY
OK:
Voltage: 10--14 V
NG : INSPECT CHARGING SYSTEM
OK : GO TO NEXT STEP
- INSPECT SKID CONTROL ECU TERMINAL VOLTAGE(IG1 TERMINAL)
IN CASE OF USING HAND-HELD TESTER:
- Check the voltage condition output from the ECU displayed on the hand-held tester.
OK:
"Normal" is displayed.
IN CASE OF NOT USING HAND-HELD TESTER:
- Remove the skid control ECU with connectors still connected.
- Turn the ignition switch ON.
- Measure voltage between terminals IG1 and GND of skid control ECU.
OK:
Voltage: 10--14 V
NG : REPAIR OR REPLACE HARNESS OR CONNECTOR
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK : GO TO NEXT STEP
- Check the voltage condition output from the ECU displayed on the hand-held tester.
- INSPECT SKID CONTROL ECU TERMINAL VOLTAGE (FR+, FL+, RR+, RL+ TERMINAL)
- Remove the skid control ECU with connectors still connected.
- Turn the ignition switch ON.
- Measure voltage between terminals FR+, FL+, RR+ and RL+ and GND of skid control ECU.
OK:
Voltage: 9--14 V
NG : REPAIR OR REPLACE HARNESS OR CONNECTOR
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK : CHECK AND REPLACE SKID CONTROL ECU ASSY