Inspection Procedure
- Check park/neutral position switch (Park/Reverse position switch circuit).
PREPARATION:
- Jack up the vehicle.
- Disconnect the connector from the park/neutral position switch.
CHECK:
Check continuity between each terminal shown below when the shift lever is moved to each position.
OK:
PARK/NEUTRAL POSITION SWITCH CONTINUITYP position switch Terminals 3 - 1 Continuity R position switch Terminals 3 - 2 Continuity
- NG: Replace park/neutral position switch.
- OK: Go to next step.
- Check for open and short circuit in harness and connector between terminals P and R of skid control ECU and ECM connector and battery (See HOW TO USE THE DIAGNOSTIC CHART AND INSPECTION PROCEDURE
).
- NG: Repair or replace harness or connector.
- OK: Check and replace skid control ECU or ECM.