Turbocharger (G2300869): Installation
- Install the special tools.
Special Tool(s): JLR-303-1677
- Install the exhaust manifold gasket.
Renew Part: Exhaust manifold gasket Quantity: 1 .
- Install the special tools.
- Install the turbocharger.
- Install 2 new bolts, spacers and washers in the illustrated positions.
Renew Part: Exhaust manifold bolts Quantity: 2 .
- Use the special tool to tighten the 2 bolts, spacers and washers.
Special Tool(s): JLR-303-1683
Torque : 5 Nm
- Remove the special tools.
Special Tool(s): JLR-303-1677
- Install 11 new bolts, spacers and washers.
Renew Part: Exhaust manifold bolts Quantity: 11 .
- Install, but do not fully tighten the 11 new bolts, spacers and washers.
- Install 11 new bolts, spacers and washers.
-
CAUTION: When fully tightened, allow 4 hours for the thread locking compound to cure. Do not start the engine within 4 hours of completing this step.
- Use the special tool to tighten the 13 bolts in the illustrated sequence.
Special Tool(s): JLR-303-1683
Torque
Stage 1: 8 Nm
Stage 2: 12 Nm
Stage 3: 15 Nm
Stage 4: 135°
Stage 5: 24 Nm
- Use the special tool to tighten the 13 bolts in the illustrated sequence.
- Install 2 new O-ring seals.
Renew Part: Oil return pipe O-ring seal Quantity: 2 .
- Install the oil return pipe.
- Install and tighten the bolt.
Torque : 10 Nm
- Install 2 new O-ring seals.
- Install the 2 new oil supply pipe sealing washers.
Renew Part: Oil supply pipe sealing washers Quantity: 2 .
- Install the banjo bolt.
- Reposition the oil supply pipe in the correct location.
- Tighten the bolt.
Torque : 18 Nm
- Install the 2 new oil supply pipe sealing washers.
-
- Install the turbocharger inner heatshield to the clip.
- Install and tighten the bolt.
Torque : 9 Nm
-
- Install the turbocharger rear heatshield to the clip.
- Install and tighten the 2 bolts.
Torque : 9 Nm
- Install the turbocharger front heatshield to the 2 clips.
-
- Install the turbocharger upper heatshield to the 2 clips.
- Install and tighten the 2 bolts.
Torque : 6.5 Nm
- Install and tighten the 3 bolts.
Torque : 9 Nm
- Install 2 new O-ring seals.
Renew Part: Turbocharger coolant pipe O-ring seal Quantity: 2 .
- Connect the 2 coolant pipes to the turbocharger.
- Install and tighten the bolt.
Torque : 11 Nm
- Install 2 new O-ring seals.
- Connect the turbocharger actuator electrical connector.
- Install and tighten the turbocharger mounting bolt.
Torque : 26 Nm
- Install the catalytic converter.
Refer to: CATALYTIC CONVERTER
- Install the electric supercharger.
Refer to: ELECTRIC SUPERCHARGER
- Install the charge air cooler inlet pipe.
Refer to: CHARGE AIR COOLER INLET PIPE