LEMON Manuals: Even more car manuals for everyone
Home >> Land Rover >> 2022 >> Defender 90 X >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 21 (Engine - INGENIUM 2.0L Petrol/INGENIUM I4 2.0L Petrol - PHEV -- Defender/L663 (2 Of 2)) >> Engine - INGENIUM I4 2.0L Petrol/INGENIUM I4 2.0L Petrol - PHEV (G2344339) >> Removal And Installation >> Variable Camshaft Timing Actuator (G2320247) >> Installation

Variable Camshaft Timing Actuator (G2320247): Installation

WARNING: This page is about a different variant/trim than selected.
  1. NOTE: Maintain tension on the chain to prevent the coloured link from disengaging with its sprocket position.
    G11717813Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install a new upper timing chain guide.

      Renew Part: Upper timing chain guide Quantity: 1  .

    • Install and tighten the bolt.

      Renew Part: Left side timing chain guide bolt Quantity: 1  .

      Torque  : 25 Nm 

  2. CAUTION: Make sure that the upper timing chain does not come off the idler sprocket and stays in the correct position.
    G11717814Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the intake camshaft VCT  unit. Make sure that the correct VCT  unit is installed as noted in the removal steps.
    • Make sure that the camshaft pin is correctly seated in the VCT  unit as illustrated.
    • Install and tighten the new VCT  unit center bolt.

      Renew Part: Variable camshaft timing actuator bolts Quantity: 1  .

      Torque 

      Stage 1: 10 Nm 

      Stage 2: Loosen 90° 

    • Check if the highlighted link on the timing chain is aligned with the timing mark on the VCT  unit as illustrated.
  3. NOTE: Maintain tension on the chain to prevent the coloured link from disengaging with its sprocket position.
    G11717815Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Install a new upper timing chain guide.

    Renew Part: Upper timing chain guide Quantity: 1  .

  4. CAUTION: Make sure that the upper timing chain does not come off the idler sprocket and stays in the correct position.
    G11717816Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the VCT  actuator. Make sure that the correct VCT  actuator is installed as noted in the removal steps.
    • Make sure the dowel is correctly installed to the VCT  actuator as illustrated.
    • Install and tighten the new bolt.

      Renew Part: Variable camshaft timing actuator bolts Quantity: 1  .

      Torque 

      Stage1: 10 Nm 

      Stage2: Loosen 90° 

    • Make sure the timing mark is aligned with the center of the colored link.
  5. CAUTION: Make sure that the upper timing chain does not come off the idler sprocket and stays in the correct position.
    G11717817Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install a new upper timing chain guide.

      Renew Part: Upper timing chain guide Quantity: 1  .

    • Install and tighten the 2 bolts.

      Renew Part: Upper timing chain upper guide bolt Quantity: 2  .

      Torque  : 11 Nm 

  6. G11717789Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the special tool.

      Special Tool(s): JLR-303-1636 

    • Install and tighten the 2 bolts.

      Torque  : 13 Nm 

  7. G11717792Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Install and tighten a new upper timing chain tensioner.

    Renew Part: Upper timing chain tensioner Quantity: 1  .

    Torque  : 55 Nm 

  8. CAUTION: Do not directly touch the timing chain tensioner at this stage.
    G11717821Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Push and release the upper timing chain guide to release the upper timing chain tensioner.
    • Make sure the upper timing chain is correctly released.
  9. G11717791Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Tighten the bolt.

    Torque 

    Stage 1: 25 Nm 

    Stage 2: 60° 

  10. G11717793Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Remove the 2 bolts.
    • Remove the special tool.

      Special Tool(s): JLR-303-1636 

  11. G11717788Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Remove the 2 bolts.
    • Remove the special tool.
  12. Install the upper timing cover.

    Refer to: UPPER TIMING COVER

  13. G14055418Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Remove the 2 bolts.
    • Remove the special tool.

      Special Tool(s): JLR-303-1630 

  14. NOTE: This step is to make sure that the timing components are properly installed.
    G14055095Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Use the special tool JLR-303-1656 to rotate the crankshaft 2 times clockwise.

    Special Tool(s): JLR-303-1656 

  15. G14055414Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the charge air cooler bracket.
    • Install and tighten the 2 bolts.

      Torque  : 47 Nm 

    • Install and tighten the nut.

      Torque  : 9 Nm 

  16. G14055413Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Reposition the 2 coolant pipes in the correct location.
    • Install and tighten the nut.

      Torque  : 9 Nm 

    • Install the 4 clips.
  17. Install the charge air cooler.

    Refer to: CHARGE AIR COOLER - INGENIUM I4 2.0L PETROL

  18. Install the hood.

    Refer to: HOOD

  19. Connect the 12 V system.

    Refer to: 12V SYSTEM DISCONNECT AND CONNECT