LEMON Manuals: Even more car manuals for everyone
Home >> Land Rover >> 2022 >> Defender 90 S >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Battery, Mounting And Cables - Vehicles With: PHEV -- Defender/L663) >> Battery, Mounting And Cables - Vehicles With: PHEV (G2608197) >> Description And Operation >> Battery And Cables (G2749057) >> Description >> Plug-In Hybrid Electric Vehicle Battery

Plug-In Hybrid Electric Vehicle Battery

WARNING: This page is about a different variant/trim than selected.
WARNING: Do not do any work on the PHEV  battery until the HV  system on the vehicle is powered down.

For additional information, Refer to: PHEV POWER DOWN/UP - HANDHELD 

G15310985Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
ITEM DESCRIPTION
1 Master Service Disconnect (MSD) locking lever
2 MSD 
3 Vehicle harness electrical connector
4 Electrical connector to the High Voltage Integrated Box
5 Electrical connector to the inverter
6 PHEV  battery coolant outlet
7 PHEV  battery coolant inlet

The PHEV  battery is located under the loadspace compartment.

The PHEV  battery is made of a number lithium ion cells that are connected together in modules. These modules are then connected together to form the PHEV  battery.

The PHEV  battery has an MSD  .

The PHEV  battery has these electrical connections:

The MSD  is located under the loadspace floor, on the left corner at the rear of the second row seats. The MSD  disconnects the electrical circuit within the PHEV  battery.

The MSD  has a lock to secure it to the MSD  connection. The MSD  lock lever must be moved before the MSD  can be removed from the MSD  connection.

After re-installing the MSD  make sure that the MSD  lock lever is fully closed before operating the vehicle. Use a Jaguar Land Rover (JLR) approved diagnostic equipment to make sure that no Diagnostic Trouble Code(s) (DTC) have been stored for the PHEV  battery when the MSD  is disconnected.