Home >> Land Rover >> 2022 >> Defender 110 SE >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 3 (Fuel Charging And Controls - Turbocharger - INGENIUM 2.0L Petrol/INGENIUM I4 2.0L Petrol - PHEV -- Defender/L663) >> Fuel Charging And Controls - Turbocharger - INGENIUM I4 2.0L Petrol/INGENIUM I4 2.0L Petrol - PHEV (G2748212) >> Removal And Installation >> Turbocharger - INGENIUM I4 2.0L Petrol - PHEV (G2748214) >> Installation

Turbocharger - INGENIUM I4 2.0L Petrol - PHEV (G2748214): Installation

WARNING: This page is about a different variant/trim than selected.
  1. CAUTION: Make sure that the mating faces are clean and free of foreign material.

    Install a new turbocharger gasket.

    Renew Part: Turbocharger to exhaust manifold gasket Quantity: 1  .

  2. G12004987Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the turbocharger.
    • Install and tighten the 2 new nuts.

      Renew Part: Exhaust manifold to turbocharger nuts Quantity: 2  .

      Torque  : 10 Nm 

  3. Fig 1: Turbocharger Assembly Retaining Nuts Tightening Sequence
    G12004988Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install and tighten the remaining 2 new nuts.

      Renew Part: Exhaust manifold to turbocharger nuts Quantity: 2  .

      Torque  : 10 Nm 

    • Tighten the 4 nuts in the illustrated sequence.

      Torque  : 25 Nm 

  4. Connect the electrical connector to the turbocharger.
    • Install 2 new O-ring seals to the oil return pipe.

      Renew Part: Turbocharger oil return pipe seals Quantity: 2  .

    • Install the turbocharger oil return pipe.
    • Install and tighten the bolt.

      Torque  : 11 Nm 

    • Connect the turbocharger outlet pipe to the charge air cooler.
    • Connect the turbocharger outlet pipe to the turbocharger.
    • Connect the electrical connector to the charge air recirculation valve.
    • Install the clip.
    • Reposition the catalytic converter into the correct location.
    • Install and tighten the 2 bolts.

      Torque  : 25 Nm 

    • Install a new gasket to the catalytic converter.

      Renew Part: Catalytic converter to turbocharger gasket Quantity: 1  .

    • Install a new clamp to the catalytic converter.

      Renew Part: Catalytic converter to turbocharger clamp Quantity: 1  .

    • Connect the catalytic converter to the turbocharger.
    • Tighten the clamp.

      Torque  : 12 Nm 

    • Connect the 2 coolant pipes to the turbocharger.
    • Install and tighten the bolt.

      Torque  : 12 Nm 

    • Install the pipe.
    • Install 2 new washers.

      Renew Part: Turbocharger oil feed pipe banjo bolt washers Quantity: 2  .

    • Install and tighten the bolt.

      Torque  : 18 Nm 

  5. Install the turbocharger lower heatshield to the clip.
    • Install the turbocharger upper heatshield.
    • Install and tighten the 3 bolts.

      Torque  : 9 Nm 

    • Install the turbocharger front heatshield.
    • Install and tighten the 4 bolts.

      Torque  : 9 Nm 

    • Install the turbocharger rear heatshield.
    • Install and tighten the 2 bolts.

      Torque  : 9 Nm 

  6. Install the engine undershield.

    Refer to: ENGINE UNDERSHIELD

  7. Install the intake air resonator.

    Refer to: INTAKE AIR RESONATOR

  8. Install the secondary bulkhead center panel.

    Refer to: SECONDARY BULKHEAD CENTER PANEL - INGENIUM I4 2.0L PETROL/INGENIUM I4 2.0L PETROL - PHEV/INGENIUM I6 3.0L DIESEL/INGENIUM I6 3.0L PETROL

  9. Connect the 12 V system.

    Refer to: 12V SYSTEM DISCONNECT AND CONNECT

  10. Vacuum fill the cooling system.

    Refer to: COOLING SYSTEM PARTIAL DRAINING AND VACUUM FILLING

    • Check the engine oil level.
    • Top up the engine oil level if necessary.

      Refer to: SPECIFICATIONS