Dual Mass Flywheel - INGENIUM I4 2.0L Petrol - PHEV (G2748118): Removal
- If the vehicle has been powered down, do not power up the vehicle until all the bonding points have been tested.
- It is the responsibility of the Electric Vehicle Senior Authorised Person (EVSAP) to make sure they comply with any local legislation for work on High Voltage (HV).
- The approved Personal Protective Equipment (PPE) must be worn where indicated within this procedure and not removed unless indicated within a step. All items of PPE must be checked for signs of damage before each use, if damaged, replacement PPE must be obtained before doing this procedure.
- All Permit To Work (PTW) documents must be kept for a minimum of 5 years.
- This procedure contains some variation in the illustrations depending on the vehicle specification, but the essential information is always correct.
- This procedure contains illustrations showing certain components removed to provide extra clarity.
- Raise and support the vehicle on a suitable 2 post lift.
Refer to: JACKING AND LIFTING
-
WARNING: Jaguar Land Rover (JLR) Electric Vehicle Competent Person (EVCP) trained technicians only.
This procedure involves work on components associated with the HV system. Only technicians qualified to EVCP level or higher are allowed to do this procedure. It is mandated that all technicians involved with the steps in this procedure have read and understood the Electric Vehicle (EV) Safety Rules.
Refer to: DESCRIPTION AND OPERATION .
Power Down the HV system. Only technicians qualified to Electric Vehicle Authorised Person (EVAP) level or higher are allowed to perform this procedure. It is mandated that all technicians involved with the steps in this procedure have read and understood the Electric Vehicle Safety Rules.
Refer to: PHEV POWER DOWN/UP - HANDHELD
- Remove the transmission.
Release the 5 clips.
- Release the 2 clips.
- Reposition the wiring harness away from the charge air cooler bracket.
- Remove the nut.
- Remove the 3 bolts.
- Remove the charge air cooler bracket.
Assemble the special tools as illustrated.
Special Tool(s): JLR-303-1630 , JLR-303-1686
Install the special tools as illustrated.
Special Tool(s): JLR-303-1630 , JLR-303-1686
- Remove and discard the 8 bolts.
- Remove the dual mass flywheel.