Right Fuel Rail (G2796613): Installation
Install new fuel injector O-ring seals to the 4 fuel injectors.
Renew Part: Fuel Injector replacement kits Quantity: 4 .
-
CAUTION: If a new cylinder head has been installed then the special tool 310-200-02 without the thread must be used to install the fuel rail.
Install the special tool.
Special Tool(s): 310-200-01 , 310-200-02
-
CAUTION:
- If new fuel injectors are installed, a new injector clamp must be installed.
- Make sure that the fuel injector is aligned and installed into the fuel rail correctly, as noted in the removal step.
- Do not fully tighten the bolts at this stage.
- Lubricate the fuel injector O-ring seals with clean engine oil.
- Install the fuel rail.
- Install and tighten the 2 bolts a half turn at a time until the correct torque is achieved.
Torque : 20 Nm
Remove the special tool.
Remove the Special Tool(s): 310-200-01 , 310-200-02
- Install and tighten the 2 bolts in the illustrated sequence.
Torque : 20 Nm
- Install and tighten the 2 bolts in the illustrated sequence.
Tighten the 2 bolts in the sequence illustrated.
Torque : 30 Nm
- Tighten the 2 bolts in the illustrated sequence.
Torque : 30 Nm
- Tighten the 2 bolts in the illustrated sequence.
- Install the 4 ignition coils.
- Install and tighten the 4 bolts.
Torque : 8 Nm
- Reposition the engine wiring harness in the correct location.
- Install the 5 clips.
- Reconnect the 9 electrical connectors.
- Install and tighten the nut.
Torque : 6.2 Nm
- Install a new HP
fuel pump outlet pipe assembly to the stud on the valve cover.
Renew Part: Fuel rail supply pipe(s) Quantity: 1 .
- Connect the 3 fuel line unions.
- Tighten the 3 fuel line unions.
Torque : 20 Nm
- Install and tighten the M6 bolt.
Torque : 11.5 Nm
- Install and tighten the M8 bolt.
Torque : 26 Nm
- Install and tighten the nut.
Torque : 6 Nm
- Install a new HP
fuel pump outlet pipe assembly to the stud on the valve cover.
- Install the heatshield.
- Install and tighten the 2 bolts.
Torque
M10: 29 Nm
M6: 11.5 Nm
- Reposition the wiring harness in the correct location.
- Connect the 2 electrical connectors.
- Secure the 4 wiring harness clips as illustrated.
Install the engine mount bracket.
Install and tighten the 4 engine mount bracket bolts.
Torque
Stage 1: 45 Nm
Stage 2: 60°
Remove the engine support.
General Equipment: Transmission jack
Install and tighten the engine mount nut.
Torque : 180 Nm
- Reposition and secure the ground cable to the original position.
- Install and tighten the bolt.
Torque : 9 Nm
- Install the idler pulley bracket.
- Install and tighten the 3 bolts.
Torque : 25 Nm
- NOTE: RHD vehicles only.
- Connect the steering column shaft as illustrated.
- Install and tighten a new steering column lower shaft lower bolt.
Renew Part: Steering column lower shaft lower bolt Quantity: 1 .
Torque : 30 Nm
- Reposition the wiring harness to the original position.
- Secure the clip.
- Connect and finger tighten the 2 fuel crossover line unions as illustrated.
- Install and tighten the 4 fuel crossover line bracket bolts in the sequence illustrated.
Torque
M6: 12 Nm
- Tighten the 2 fuel crossover line unions in the sequence illustrated.
Torque : 20 Nm
- Reposition the wiring harness to the original position.
- Secure the 2 clips.
- Connect the 4 electrical connectors.
- Reposition the breather pipe to the original position.
- Secure the clip.
- Connect the breather pipe connector.
- Remove the oil filler cap.
- Install the left NVH material as illustrated.
- Secure the 2 upper clips.
- Secure the 2 lower studs.
- Install the oil filler cap.
- Connect the 2 fuel line connectors.
- Secure the 2 fuel lines to the left NVH material.
- Secure the 2 fuel line clips.
- Install the left differential pressure sensor assembly.
- Install and tighten the bolt.
Torque : 9 Nm
- Install and tighten the 2 nuts.
Torque : 9 Nm
- Connect the hose.
- Install the clamp.
- Connect the electrical connector.
- Install the clip.
- Install the right NVH material as illustrated.
- Secure the 4 lower clips.
- Secure the stud.
- Secure the 3 upper clips.
- Reposition the vacuum pipe to the original position.
- Secure the vacuum pipe to the right NVH material.
- Install the right differential pressure sensor assembly.
- Install and tighten the bolt.
Torque : 9 Nm
- Connect the hose.
- Secure the clip.
- Connect the electrical connector.
- Secure the cable bracket assembly to the original position.
- Install and tighten the 2 nuts.
Torque : 9 Nm
- Reposition the coolant pipe assembly to the original position.
- Install the coolant pipe assembly as illustrated.
- Connect the 5 coolant pipe connectors.
- Secure the 2 clips.
- Remove the air cleaner outlet pipe T-connector.
Refer to: the appropriate service information
- Remove the generator.
Refer to: GENERATOR
- Fill the engine with the correct amount of engine coolant.
Refer to: COOLING SYSTEM PARTIAL DRAINING AND VACUUM FILLING
- Connect the 12 V system.
Refer to: 12V SYSTEM DISCONNECT AND CONNECT