LEMON Manuals: Even more car manuals for everyone
Home >> Land Rover >> 2022 >> Defender 110 S >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 18 (Battery, Mounting And Cables - Vehicles With: MHEV -- Defender/L663) >> Battery, Mounting And Cables - Vehicles With: MHEV >> Removal And Installation >> Electric Supercharger To Front Junction Box Cables (G2422533) >> Installation

Electric Supercharger To Front Junction Box Cables (G2422533): Installation

WARNING: This page is about a different variant/trim than selected.
  1. Install the MHEV  battery junction box to electric supercharger cables.
    • Install the wiring harness bracket.
    • Install and tighten the 2 bolts.

      Torque  : 10 Nm 

    • Install the 2 breather pipes to the 2 clips.
  2. Raise the transmission jack.
  3. Install the front driveshaft.

    Refer to: FRONT DRIVESHAFT

  4. Install the rear driveshaft.

    Refer to: REAR DRIVESHAFT

    • Connect the electrical connector to the MHEV  battery junction box.
    • Install the wiring harness clip.
    • Install and tighten the bolt.

      Torque  : 10 Nm 

    • Install the coolant hoses to the bracket.
    • Install the clip.
    • Install the 2 fasteners.
    • Install the oil cooler.
    • Install and tighten the bolt.

      Torque  : 10 Nm 

  5. Install the transmission undershield.

    Refer to: TRANSMISSION UNDERSHIELD

    • Install and tighten the ground bolt.

      Torque  : 12 Nm 

    • Install and tighten the bracket bolt.

      Torque  : 48 Nm 

    • Connect the electrical connector to the electric supercharger.
  6. Install the 2 breather pipes to the clip.
  7. Install the secondary bulkhead center panel.

    Refer to: SECONDARY BULKHEAD CENTER PANEL - INGENIUM I4 2.0L PETROL/INGENIUM I4 2.0L PETROL - PHEV/INGENIUM I6 3.0L DIESEL/INGENIUM I6 3.0L PETROL

  8. Install the engine cover.

    Refer to: ENGINE COVER - INGENIUM I6 3.0L PETROL

  9. Power up the MHEV  system.

    Refer to: MHEV POWER DOWN/UP