PHEV Battery Coolant Radiator (G2756435): Installation
-
- Reposition the PHEV battery coolant radiator into the correct location.
- Connect the 2 coolant pipes.
- Install the PHEV battery coolant radiator to the 4 retaining clips.
- Install the coolant pipe to the 4 retaining clips.
-
- Install the lower active grille air shutter.
- Connect the electrical connector.
- Install and tighten the 6 screws.
Torque : 5 Nm
- Install the front bumper.
Refer to: FRONT BUMPER
- Fill the PHEV
battery cooling system.
Refer to: PHEV BATTERY COOLING SYSTEM DRAINING AND VACUUM FILLING
- Connect the 12 V system.
Refer to: 12V SYSTEM DISCONNECT AND CONNECT