LEMON Manuals: Even more car manuals for everyone
Home >> Land Rover >> 2021 >> Range Rover Evoque R-Dynamic S >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine - INGENIUM I4 2.0L Petrol -- Range Rover EVOQUE/L551 ( Specifications - Removal & Installation) >> Engine - INGENIUM I4 2.0L Petrol >> Removal And Installation >> Upper Timing Chain (G2309063) >> Removal

Upper Timing Chain (G2309063): Removal

CAUTION: Before disconnecting any components, make sure the area is clean and free from foreign material. When disconnected all openings must be sealed.
NOTE:
  • This procedure contains some variation in the illustration depending on the vehicle specification, but essential information is always correct.
  • This procedure contains illustrations showing certain components removed to provide extra clarity.

The following step(s) applies to: 

All vehicles 

  1. Raise and support the vehicle on a suitable 2 post lift.

    Refer to: JACKING AND LIFTING .

  2. Disconnect the startup battery ground cable.

    Refer to: 12V SYSTEM DISCONNECT .

  3. Remove the upper timing cover.

    Refer to: UPPER TIMING COVER .

  4. Remove the front wheel arch liner.

    Refer to: FRONT WHEEL ARCH LINER .

  5. G14055070Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the special tool JLR-303-1656 as illustrated.

      Special Tool(s): JLR-303-1656 

    • Use the special tool JLR-303-1656 to rotate the crankshaft until the timing marks align as illustrated.
  6. G11717788Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the special tool JLR-303-1635 as illustrated.

      Special Tool(s): JLR-303-1635 

    • Install and tighten the 2 special tool bolts.

      Torque  : 13 Nm 

  7. G11717789Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the special tool JLR-303-1636 as illustrated.

      Special Tool(s): JLR-303-1636 

    • Install and tighten the 2 special tool bolts.

      Torque  : 13 Nm 

  8. G11717790Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Install the special tool JLR-303-1630 to lock the crankshaft.

    Special Tool(s): JLR-303-1630 

    The following step(s) applies to: 

    Mild Hybrid Electric Vehicles 

  9. G14054715Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Install the special tool JLR-303-1686 adapter to the special tool JLR-303-1630 crankshaft pulley locking tool.

    Special Tool(s): JLR-303-1630  , JLR-303-1686 

  10. G14054716Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Install the special tools JLR-303-1630 and JLR-303-1686 to lock the crankshaft.

    Special Tool(s): JLR-303-1630  , JLR-303-1686 

    The following step(s) applies to: 

    All vehicles 

  11. G11717791Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Loosen, but do not fully remove the 2 Variable Camshaft Timing (VCT) bolts.

  12. G11717792Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Remove and discard the upper timing chain tensioner.

  13. G11717793Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Remove the 2 special tool bolts.
    • Remove the special tool JLR-303-1636.

      Special Tool(s): JLR-303-1636 

  14. CAUTION: Note the location of the VCT  units prior to removal. Each VCT  unit is matched to a specific camshaft.
    G11717794Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Remove and discard the 2 VCT  unit center bolts.
    • Remove the 2 VCT  units.
  15. G11717795Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Remove and discard 2 bolts.
    • Remove and discard the upper timing chain guide.
  16. G11717796Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Remove and discard the bolt.
    • Remove and discard the left upper timing chain guide.
    • Remove and discard the upper timing chain tensioner arm.
  17. G11717797Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Release the upper timing chain from the idler sprocket.
    • Remove the upper timing chain.