LEMON Manuals: Even more car manuals for everyone
Home >> Land Rover >> 2021 >> Range Rover Evoque R-Dynamic S >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine - INGENIUM I4 2.0L Petrol -- Range Rover EVOQUE/L551 ( Specifications - Removal & Installation) >> Engine - INGENIUM I4 2.0L Petrol >> Removal And Installation >> Intake Manifold (G2309274) >> Installation

Intake Manifold (G2309274): Installation

  1. NOTE: Only do this step if previously removed.
    • Install a new throttle body to intake manifold gasket.

      Renew Part: Throttle body to intake manifold seal Quantity: 1 . 

    • Install the throttle body.
    • Install and tighten the 4 bolts.

      Torque  : 12 Nm 

  2. NOTE: Only do this step if previously removed.
    • Install a new O-ring seal.

      Renew Part: Manifold absolute pressure sensor O-ring seal Quantity: 1 . 

    • Install the Manifold Absolute Pressure and Temperature (MAPT) sensor.
    • Install and tighten the bolt.

      Torque  : 5 Nm 

    • Install 4 new intake manifold gaskets.

      Renew Part: Intake manifold seals Quantity: 4 . 

    • Install the intake manifold assembly.
    • Install and tighten the 7 bolts.

      Torque  : 12 Nm 

    • Install the coolant hose to the thermostat.
    • Install the hose clamp.
    • Install the charge air cooler outlet hose.
    • Install and tighten the hose clamp.
    • Connect the throttle body electrical connector.
    • Install the wiring harness clip.
    • Connect the MAPT sensor electrical connector.
    • Connect the knock sensor electrical connector.
    • Install the 2 wiring harness clips.
    • Install the coolant pipe.
    • Install and tighten the 3 bolts.

      Torque  : 10 Nm 

    • Install the 3 coolant hoses.
    • Install the 3 hose clamps.
    • Inspect the oil level gauge O-ring seal, install a new seal if damaged.
    • Install the oil level gauge.
    • Install and tighten the bolt.

      Torque  : 10 Nm 

    • Install the vacuum pipe.
    • Install the 3 vacuum pipe clips.
    • Install the coolant pipe clip.
    • Install a new O-ring seal.

      Renew Part: Oil fill pipe O-ring seal Quantity: 1 . 

    • Install the oil filler pipe.
    • Install and tighten the bolt.

      Torque  : 9 Nm 

  3. Install the breather pipe.
  4. Install the purge valve.

    Refer to: PURGE VALVE .

  5. Install the cooling module.

    Refer to: COOLING MODULE .

  6. Connect the startup battery ground cable.

    Refer to: 12V SYSTEM DISCONNECT .