LEMON Manuals: Even more car manuals for everyone
Home >> Land Rover >> 2021 >> Range Rover Base >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 47 (Engine - INGENIUM I4 2.0L Petrol/INGENIUM I4 2.0L Petrol PHEV -- Range Rover/L405 (1 Of 2)) >> Engine - INGENIUM I4 2.0L Petrol/INGENIUM I4 2.0L Petrol - PHEV (G2412677) >> Removal And Installation >> Oil Pump Chain - INGENIUM I4 2.0L Petrol - PHEV (G2204084) >> Removal

Oil Pump Chain - INGENIUM I4 2.0L Petrol - PHEV (G2204084): Removal

WARNING: This page is about a different variant/trim than selected.
WARNING:
  • If the vehicle has been powered down, do not power up the vehicle until all the bonding points have been tested.
  • It is the responsibility of the Electric Vehicle Senior Authorised Person (EVSAP) to make sure they comply with any local legislation for work on High Voltages (HV).
  • The approved Personal Protection Equipment (PPE) must be worn where indicated within this procedure and not removed unless indicated within a step. All items of PPE must be checked for signs of damage before each use, if damaged, replacement PPE must be obtained before doing this procedure.
NOTE:
  • All Permit To Work (PTW) documents must be kept for a minimum of 5 years.
  • This procedure contains some variation in the illustrations depending on the vehicle specification, but the essential information is always correct.
  • This procedure contains illustrations showing certain components removed to provide extra clarity.
  1. WARNING: Jaguar Land Rover (JLR) Electric Vehicle Competent Person (EVCP) trained technicians only.
    G12528294Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    This procedure involves work on components associated with the High Voltage (HV) system. Only technicians qualified to Electric Vehicle Competent Person (EVCP) level or higher are allowed to do this procedure.  It is mandated that all technicians involved with the steps in this procedure have read and understood the Electric Vehicle (EV) Safety Rules.

    Refer to: ELECTRIC VEHICLE SAFETY RULES .

  2. Raise and support the vehicle on a suitable 2 post lift.

    Refer to: LIFTING .

  3. G12528295Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Power Down the High Voltage (HV) system. Only technicians qualified to EVAP level are allowed to perform this procedure. It is mandated that all technicians involved with the steps in this procedure have read and understood the Electric Vehicle Safety Rules.

    Refer to: HYBRID ELECTRIC VEHICLE POWER DOWN/UP .

  4. Refer to high voltage electrical connector operation and inspection document before disconnecting any high voltage electrical connectors.

    Refer to: HIGH VOLTAGE ELECTRICAL CONNECTOR OPERATION AND INSPECTION .

  5. Remove the oil pan.

    Refer to: OIL PAN - INGENIUM I4 2.0L PETROL .

  6. G14055369Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Using the special tool to hold the oil pump sprocket, remove and discard the bolt.

      Special Tool(s): 205-053 

    • Remove the oil pump gear.
    • Remove the oil pump chain.