LEMON Manuals: Even more car manuals for everyone
Home >> Land Rover >> 2021 >> Range Rover Base >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Fuel Charging And Controls - Turbocharger - INGENIUM I6 3.0L Petrol - Range Rover/L405 >> Fuel Charging And Controls - Turbocharger - INGENIUM I6 3.0L Petrol >> Removal And Installation >> Turbocharger (G2300869) >> Installation

Turbocharger (G2300869): Installation

  1. G14059864Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the special tools.

      Special Tool(s): JLR-303-1677 

    • Install the exhaust manifold gasket.

      Renew Part  : Exhaust manifold gasket Quantity  : 1  .

  2. G14059867Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the turbocharger.
    • Install 2 new bolts, spacers and washers in the illustrated positions.

      Renew Part  : Exhaust manifold bolts Quantity  : 2  .

    • Use the special tool to tighten the 2 bolts, spacers and washers.

      Special Tool(s): JLR-303-1683 

      Torque  : 5Nm 

  3. Remove the special tools.

    Special Tool(s): JLR-303-1677 

    • Install 11 new bolts, spacers and washers.

      Renew Part  : Exhaust manifold bolts Quantity  : 11  .

    • Install, but do not fully tighten the 11 new bolts, spacers and washers.
  4. CAUTION: When fully tightened, allow 4 hours for the thread locking compound to cure. Do not start the engine within 4 hours of completing this step.
    Fig 1: Exhaust Manifold Bolts Tightening Sequence
    G14059868Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Use the special tool to tighten the 13 bolts in the illustrated sequence.

      Special Tool(s): JLR-303-1683 

      Torque 

      Stage 1: 8Nm 

      Stage 2: 12Nm 

      Stage 3: 15Nm 

      Stage 4: 135° 

    • Install 2 new O-ring seals.

      Renew Part  : Oil return pipe O-ring seal Quantity  : 2  .

    • Install the oil return pipe.
    • Install and tighten the bolt.

      Torque  : 10Nm 

    • Install the 2 new oil supply pipe sealing washers.
    • Install a new banjo bolt.
    • Reposition the oil supply pipe in the correct location.
    • Tighten the bolt.

      Torque  : 18Nm 

    • Install the turbocharger inner heatshield to the clip.
    • Install and tighten the bolt.

      Torque  : 9Nm 

    • Install the turbocharger rear heatshield to the clip.
    • Install and tighten the 2 bolts.

      Torque  : 9Nm 

    • Install the turbocharger front heatshield to the 2 clips.
    • Install the turbocharger upper heatshield to the 2 clips.
    • Install and tighten the 2 bolts.

      Torque  : 6.5Nm 

    • Install and tighten the 3 bolts.

      Torque  : 9Nm 

    • Install 2 new O-ring seals.

      Renew Part  : Turbocharger coolant pipe O-ring seal Quantity  : 2  .

    • Connect the 2 coolant pipes to the turbocharger.
    • Install and tighten the bolt.

      Torque  : 11Nm 

  5. Connect the turbocharger actuator electrical connector.
  6. Install and tighten the turbocharger mounting bolt.

    Torque  : 26Nm 

  7. Install the catalytic converter.

    Refer to: CATALYTIC CONVERTER .

  8. Install the electric supercharger.

    Refer to: Electric Supercharger REMOVAL AND INSTALLATION .

  9. Install the charge air cooler inlet pipe.

    Refer to: CHARGE AIR COOLER INLET PIPE (G2397641) .