Instrument Panel Cluster
The virtual display IPC is connected to the Body Control Module (BCM)/Gateway Control Module (GWM) on the High Speed (HS) Controller Area Network (CAN) Human Machine Interface (HMI) systems bus. The TCM is connected to the BCM /GWM on the FlexRay systems bus. Transmission status is transmitted by the TCM and displayed to the driver in 1 of 2 displays on the IPC .
For additional information, refer to: ENGINE COOLING - INGENIUM I4 2.0L PETROL