LEMON Manuals: Even more car manuals for everyone
Home >> Land Rover >> 2021 >> Defender 110 S >> Repair and Diagnosis >> Engine Mechanical >> Cooling System (Mechanical) >> Engine Cooling - INGENIUM 2.0L Petrol/INGENIUM I4 2.0L Petrol - PHEV -- Defender/L663 >> Engine Cooling - INGENIUM I4 2.0L Petrol/INGENIUM I4 2.0L Petrol - PHEV (G2344342) >> Removal And Installation >> Electric Thermostat (G2417536) >> Installation

Electric Thermostat (G2417536): Installation

    • Install the new O-ring seal.

      Renew Part: Thermostat housing seal(s) Quantity: 1  .

    • Install the electric thermostat.
    • Install and tighten the 4 bolts.

      Torque  : 12 Nm 

  1. Connect the 2 electrical connectors to the electric thermostat.
  2. Connect the engine coolant lower hose to the electric thermostat.
    • Connect the engine coolant front hose to the electric thermostat.
    • Secure the 2 clips.
    • Install and connect the purge valve pipe on both sides.
    • Secure the 2 clips.
    • Secure the 2 clips.
    • Install the engine coolant rear hose.
  3. CAUTION: Make sure that the clips are correctly located.
    • Install the engine coolant upper hose.
    • Secure the clip.
    • Install the Noise, Vibration and Harshness (NVH) pad.
    • Install the 2 clips.
    • Install the fastener.
  4. Install the left secondary bulkhead panel.

    Refer to: SECONDARY BULKHEAD LEFT PANEL - INGENIUM I4 2.0L PETROL/INGENIUM I4 2.0L PETROL - PHEV/INGENIUM I6 3.0L DIESEL/INGENIUM I6 3.0L PETROL

  5. Fill the engine cooling system with the correct amount of coolant fluid.

    Refer to: COOLING SYSTEM PARTIAL DRAINING AND VACUUM FILLING 

  6. Install the engine cover.

    Refer to: ENGINE COVER - INGENIUM I4 2.0L PETROL

  7. Connect the startup battery ground cable.

    Refer to: 12V SYSTEM DISCONNECT AND CONNECT