Electric Cooling Fan And Shroud (G2423944): Installation
-
NOTE: Take care not to damage the surrounding components.
- Install the electric cooling fan and shroud at the 3 clips.
- Install and tighten the 2 bolts.
Torque : 7 Nm
-
- Connect the 3 electrical connectors.
- Secure the clip.
-
- Reposition the charge air cooler coolant pump.
- Install and tighten the bolt.
Torque : 9 Nm
- Secure the clip.
- Connect the coolant pump electrical connector.
-
- Reposition the Automatic Transmission Fluid (ATF) cooler.
- Install and tighten the bolt.
Torque : 9 Nm
- Install the 2 coolant hose clips.
-
- Install the Air Conditioning (A/C) pipe.
- Install and tighten the bolt.
Torque : 7 Nm
- Connect the 2 coolant hoses.
- Connect the 3 coolant hoses.
- Install the engine undershield.
Refer to: ENGINE UNDERSHIELD
- Connect the startup battery ground cable.
Refer to: 12V SYSTEM DISCONNECT AND CONNECT
- Fill the engine cooling system with the correct amount of coolant fluid.
Refer to: COOLING SYSTEM PARTIAL DRAINING AND VACUUM FILLING