LEMON Manuals: Even more car manuals for everyone
Home >> Land Rover >> 2013 >> LR2 Base >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Fuel Charging & Controls - Turbocharger - GTDI 2.0L Petrol -- LR2/L359 >> Fuel Charging And Controls - Turbocharger - GTDI 2.0L Petrol >> Turbocharger (Removal And Installation) >> Removal And Installation >> Installation

Removal And Installation: Installation

  1. CAUTION: Tighten the bolts in the sequence shown.
    NOTE: Install new gasket.
    Fig 1: Turbocharger Flange Bolts Tightening Sequence
    G11587689Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Torque Specification: 50 Nm 

  2. CAUTION:
    • Make sure that a new Turbocharger drain pipe is installed.
    • Make sure that the gasket is correctly located.
    NOTE: Install new gaskets.
    G11587629

    Install a new Turbocharger oil drain pipe.

    Torque Specification: 10 Nm 

  3. CAUTION: Make sure that new sealing washers are installed.

    To install, reverse the removal procedure.