LEMON Manuals: Even more car manuals for everyone
Home >> Kia >> 2024 >> Telluride SX X-Line >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Hydraulic System >> Line Pressure Control Solenoid Valve (LINE_VFS) >> Removal And Installation >> Installation

Removal And Installation: Installation

  1. Install in the reverse order of removal.
    NOTE: The existing valve body cover gasket (A) must be replaced with a new one (do not reuse).
    G15693784Courtesy of KIA MOTORS AMERICA, INC.
  2. Perform the procedures below after installing.
    1. Refill the automatic transaxle fluid.

      (Refer to Hydraulic System - "FLUID ")

    2. Refill the coolant.

      (Refer to Engine Mechanical System - "COOLANT ")

    3. Clear the diagnostic trouble codes (DTC) using the KDS.

      Disconnecting the battery negative terminal will not clear the DTCs. Clear DTCs using the KDS at all times.

    4. Perform the order below with the KDS.

      (S/W Management → Automatic Transaxle → Resetting Auto T/A Values)

      Information 

      Refer to the KDS screen for operating conditions and details.

    5. Perform the TCM adaptive values learning procedure.

      (Refer to Automatic Transaxle Control System - "ADJUSTMENT ")

    6. After installing, check for leakage of fluid from hose connection during engine starting and running.