Removal & Installation: Installation
- Install in the reverse order of removal.NOTE: Install the radiator to the specified torque.
- Fill with engine coolant.
(Refer to Cooling System - "COOLANT ")
- Start engine and check for leaks.
- Recheck engine coolant level.