Charging System Insulation Resistance Inspection
- Charge the vehicle with a working EVSE (regular charging station).
- If unable to charge, check the EVSE (standard charger) status.
- Is there a leakage current fault in the EVSE (standard charger)? Does the leakage circuit breaker of the electrical equipment work?
Good
- Go to "Proximity Detection (PD) Signal Inspection" procedure.
No Good
- Go to next procedure.
| Inspection Condition | (+) Probe | (-) Probe | Specification | ||
|---|---|---|---|---|---|
| Connector | Terminal | Connector | Terminal | ||
|
Charge connector | 1 (AC neutral) | Chassis ground | - | Above 10MΩ (mega Ω meter: when DC is 500V) |
| Charge connector | 2 (AC live) | Chassis ground | - | Above 10MΩ (mega Ω meter: when DC is 500V) | |
Good
- If the measured value is normal when re-measure "Insulation Resistance of Charging System AC Input", thoroughly check the EVSE (standard charger).
- For further checking of the vehicle charging system, go to "Proximity Detection (PD) Signal Inspection" procedure.
No Good
- Go to next procedure for more precise diagnosis.
| Inspection Condition | (+) Probe | (-) Probe | Specification | ||
|---|---|---|---|---|---|
| Connector | Terminal | Connector | Terminal | ||
|
Charge connector | 1 (AC neutral) | Chassis ground | 5 (ground) | Above 10MΩ (mega Ω meter: when DC is 500V) |
| Charge connector | 2 (AC live) | Chassis ground | 5 (ground) | Above 10MΩ (mega Ω meter: when DC is 500V) | |
Good
- Go to next procedure.
No Good
- Repair or replace the wire as necessary and than Go to "Verification Of Repair " procedure.
| Inspection Condition | (+) Probe | (-) Probe | Specification | ||
|---|---|---|---|---|---|
| Connector | Terminal | Connector | Terminal | ||
|
OBC (component side) | 1 (AC neutral) | Chassis ground | - | Above 10MΩ (mega Ω meter: when DC is 500V) |
| OBC (component side) | 3 (AC live) | Chassis ground | - | Above 10MΩ (mega Ω meter: when DC is 500V) | |
Good
- Carefully re-do "Charging System Insulation Resistance Inspection" procedure.
- Thoroughly check connectors for looseness, poor connection, bending, corrosion, contamination, deterioration, or damage.
No Good
- Replace the "OBC" with a working one and than Go to "Verification Of Repair " procedure.
| Proximity Detection (PD) Signal Inspection | ||
|---|---|---|
| Inspection Condition | Inspection Procedure | Reference |
|
|
Fig.1 to 2 |
Good
- Go to "Inlet Lock Device Inspection" procedure.
No Good
- See if there is any foreign substance around the charger connector or charger terminal.
- Go to "Charging Cable (charging connector) Inspection" procedure.
| Charging Cable (charging connector) Inspection | |||||
|---|---|---|---|---|---|
| Inspection Condition | (+) Probe | (-) Probe | Specification | ||
| Connector | Terminal | Connector | Terminal | ||
|
EVSE cable connector | Detection | EVSE cable connector | Ground | Approx. 1500Ω (10A) Approx. 680Ω (16A) Approx. 220Ω (32A) Approx. 100Ω (64A) |
Good
- Go to "Charging Connector Inspection" procedure.
No Good
- Repair or replace the EVSE charging cable (charging connector) and than Go to "Verification Of Repair " procedure.
- If able to replace the charging cable, replace it and start charging.
- If unable to replace the charging cable, charge it with a different EVSE.
| Charging Connector Inspection | |||||
|---|---|---|---|---|---|
| Inspection Condition | (+) Probe | (-) Probe | Specification | ||
| Connector | Terminal | Connector | Terminal | ||
|
Charge connector | 5 (ground) | Chassis ground | - | Approx. below 1Ω |
| Charge connector | 4 (detection) | Charge connector | 5 (ground) | Approx. 2.7kΩ | |
|
Charge connector | 4 (detection) | OBC connector | 32 (detection) | Approx. below 1Ω |
| Charge connector | 4 (detection) | Chassis ground | - | 0V | |
Good
- Go to "Control Pilot (CP) Signal Circuit Inspection" procedure.
No Good
- See if there is any defect on the exterior of the charging connector.
- Repair or replace the fault in the inlet lock device and than Go to "Verification Of Repair ".
| Control Pilot (CP) Signal Circuit Inspection | |||||
|---|---|---|---|---|---|
| Inspection Condition | (+) Probe | (-) Probe | Specification | ||
| Connector | Terminal | Connector | Terminal | ||
|
Charge connector | 3 (control pilot) | OBC connector | 24 (control pilot) | Approx. below 1Ω |
| Charge connector | 3 (control pilot) | Charge connector | 5 (ground) | ∞ (infinity)Ω | |
Good
- Go to "AC Power High Voltage Cable Inspection" procedure.
No Good
- Repair or replace the fault in the wire harness and than Go to "Verification Of Repair ".
| AC Power High Voltage Cable Inspection (Charging connector - OBC) | |||||
|---|---|---|---|---|---|
| Inspection Condition | (+) Probe | (-) Probe | Specification | ||
| Connector | Terminal | Connector | Terminal | ||
|
Charge connector | 1 (AC neutral) | High voltage cable of OBC | 1 (AC neutral) | Approx. below 1Ω |
| Charge connector | 2 (AC live) | High voltage cable of OBC | 3 (AC live) | Approx. below 1Ω | |
| Charge connector | 5 (ground) | High voltage cable of OBC | 2 (ground) | Approx. below 1Ω | |
| Charge connector | 1 (AC neutral) | Charge connector | 2 (AC live) | ∞ (infinity)Ω | |
| Charge connector | 1 (AC neutral) | Charge connector | 5 (ground) | ∞ (infinity)Ω | |
| Charge connector | 2 (AC live) | Charge connector | 5 (ground) | ∞ (infinity)Ω | |
Good
- If you cannot charge the vehicle through a different EVSE, replace the OBC and re-try charging.
No Good
- Repair or replace the fault in the wire harness and than Go to "Verification Of Repair ".