Operating Test
This test should be performed in the PTC ON conditions.
- Run the engine.
- Check the current on wiring with a clamp multi tester.
| Pattern |
Current (A) |
| PTC 1 ON |
0.1 - 33 |
| PTC 2 ON |
0.1 - 33 |
| PTC 3 ON |
0.1 - 33 |
| Total |
0.1 - 100 |
- If the current is not specification, inspect related wiring.