[Electrical inspection]
WARNING: This page is about a different variant/trim than selected.
- Connect power supply line and ground line to the NVLD terminals as below.
- Measure current between the NVLD terminal 1 and battery (+) terminal during NVLD switch open.
- Measure current between the NVLD terminal 1 and battery (+) terminal during NVLD switch closed.
- Measure current between the NVLD terminal 2 and battery (+) terminal during NVLD switch open.
- Check the current is within the specification.