Control Circuit Inspection
WARNING: This page is about a different variant/trim than selected.
- Ignition "OFF" & Disconnect PCSV connector.
- Ignition "ON"
- Measure voltage between Pin No. 2 (Control) terminal of PCSV harness connector and chassis ground.
Specification: Approx. 3.5V
- Ignition "OFF" & Disconnect PCM connector.
- Measure resistance between Pin No. 2 (Control) terminal of PCSV harness connector and chassis ground.
Specification: ∞
- Measure resistance between Pin No. 1 (Power) and Pin No. 2 (Control) of the PCSV.
Specification: ∞
- Is the measured Value within specification?
YES
- Go to "COMPONENT INSPECTION " procedure.
NO
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure