LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2025 >> Grand Cherokee Altitude, AWD >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Instrument Cluster (Service Information) >> Display, Heads Up >> Removal And Installation >> Heads Up Display

Heads Up Display

REMOVAL 

  1. Remove the Instrument Panel Pad. Refer to PAD, INSTRUMENT PANEL, REMOVAL AND INSTALLATION .
  2. Remove the left front air duct. Refer to DUCT, INSTRUMENT PANEL, REMOVAL AND INSTALLATION .
  3. Remove the fasteners securing the HUD Module to the instrument panel carrier.
    GC0201873Courtesy of CHRYSLER GROUP, LLC
    1 - Fasteners
    2 - Instrument Panel Carrier
    3 - Heads Up Display (HUD) Module
  4. Lift the HUD up far enough to gain access to the wire harness connectors.
    GC0199353Courtesy of CHRYSLER GROUP, LLC
    1 - HUD Module
    2 - Wire Harness Connectors
  5. Disconnect the wire harness connectors and remove the HUD from the vehicle.

INSTALLATION 

Follow the removal procedure in reverse for general reassembly of the components on the vehicle. The steps listed below are calling out specific procedures that should be followed during installation.