Diagnostic Test
WARNING: This page is about a different car, the 2024 Jeep Grand Wagoneer L and 2024 Jeep Grand Wagoneer. However, it is still accessible from the selected car via links, so may be relevant.
- READ AND RECORD DTCS AND ENVIRONMENTAL DATA - ERASE DTCS AND CHECK FOR THE DTC TO RETURN
- With the scan tool, read DTCs in all Electronic Control Units (ECUs) and record on the repair order.
- For future reference, with the scan tool, run and save a vehicle Scan Report and all related recorded data.
- With the scan tool, erase all DTCs.
- Turn the ignition off for a minimum of 10.0 seconds.
- Turn the ignition on.
- Using the When Monitored and Set Conditions above and recorded data, operate the vehicle in the conditions that set the DTC.
- With the scan tool, read DTCs.
Did the DTC return?
Yes
- Go To 2
No
- Perform the INTERMITTENT CONDITION diagnostic procedure. Refer to INTERMITTENT CONDITION .
- CHECK FOR OTHER DTCS
- Refer to the recorded DTCs.
Are there any Battery or charging system DTCs present?
Yes
- Perform the applicable diagnostic procedure(s). Refer to DIAGNOSTIC CODE INDEX .
No
- Go To 3
- Refer to the recorded DTCs.
- ISOLATE AND CHECK THE IBS FUSED B+ CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- The ignition must be off when checking the continuity of a circuit.
- Isolate the circuit by disconnecting the Electronic Control Unit (ECU) and the component harness connector containing the circuit being tested. Note: Use the wiring diagram as a guide to follow the path of the circuit.
- Before measuring the resistance of any circuit, first measure the resistance between the two leads of the DVOM. Note: The meter leads can add resistance to the measurement value.
- Connect the leads of the DVOM to the circuit being tested.
Is the resistance below 3.0 Ohms?
Yes
- Go To 4
No
- Repair the circuit for an open or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
- ISOLATE AND CHECK THE IBS GROUND CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- The ignition must be off when checking the continuity of a circuit.
- Isolate the circuit by disconnecting the Electronic Control Unit (ECU) and the component harness connector containing the circuit being tested. Note: Use the wiring diagram as a guide to follow the path of the circuit.
- Before measuring the resistance of any circuit, first measure the resistance between the two leads of the DVOM. Note: The meter leads can add resistance to the measurement value.
- Connect the leads of the DVOM to the circuit being tested.
Is the resistance below 3.0 Ohms?
Yes
- Go To 5
No
- Repair the circuit for an open or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
- REPLACE THE INTELLIGENT BATTERY SENSOR (IBS)
The Intelligent Battery Sensor is reporting an irrational temperature signal, view repair to continue.
Repair
- Replace the Intelligent Battery Sensor in accordance with the Service Information. Refer to SENSOR, INTELLIGENT BATTERY (IBS), REMOVAL AND INSTALLATION .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .