Charging System Testing: Notes
WARNING: This page is about a different car, the 2023 Jeep Grand Wagoneer. However, it is still accessible from the selected car via links, so may be relevant.
PRELIMINARY INSPECTION
Perform the following inspections before diagnosing the Smart Alternator system:
- Verify proper battery condition and charge level.
- Inspect condition and connections at the battery cable terminals, battery posts, ground locations and Smart Alternator. They should be clean and tight. Repair as required.
- Inspect all fuses in both the BCM and Power Distribution Center (PDC) for tightness in receptacles. They should be properly installed and tight. Repair or replace as required.
- Inspect Alternator drive belt and tensioner condition. Verify proper belt tension.