LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2023 >> Renegade Red >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> 1.3L Engine (Service Information) (2 Of 2) >> Cylinder Head >> Assembly, Variable Valve Actuation >> Removal And Installation >> Installation

Removal And Installation: Installation

NOTE:

If the Variable Valve Actuation Assembly (VVAA) module was replaced or removed and refitted, connect the diagnosis equipment to the EOBD socket and run the parameter learning using the "Reset adaptive VCM" routine in wiTEch.

  1. If removed, install the multiair oil supply actuator filter. Refer to FILTER, MULTIAIR ACTUATOR OIL SUPPLY, REMOVAL AND INSTALLATION  .
    GC0200102Courtesy of CHRYSLER GROUP, LLC
  2. Install a NEW  VVAA gasket (1a) on the cylinder head and the centering dowels (1b).
  3. Install two 2025300091 Guide Pins (2) in position as shown in illustration.
    Fig 1: VVAA Module Bolts Tightening Sequence
    GC0200069Courtesy of CHRYSLER GROUP, LLC
  4. Install the VVAA module (1) complete with the tool, using the guide pins (2) installed previously as a guide for the correct mating between the VVAA module pistons and the valves.
  5. Install and tighten the VVAA module bolts (3) 1 to 4 with a pre-torque of 15 N.m (11 ft. lbs.) to bring the module into contact with the cylinder head, then remove the pins. Install and tighten the bolts 5 to 15 with a pre-torque of 15 N.m (11 ft. lbs.) in a diagonal sequence.
  6. Using the tighten sequence shown in illustration, tighten the bolts (3) 1 to 15 to:
    • Stage 1 15 N.m (11 ft. lbs.).
    • Stage 2 25 N.m (18 ft. lbs.).
    GC0200075Courtesy of CHRYSLER GROUP, LLC
  7. Check that the VVAA module pistons (1) are mated correctly with the valves.
  8. Remove the (special tool #10259B, Compressor, MultiAir® Spring) (2020000090), (special tool #2027207090, Tab, 90 Degree), and the (special tool #2020001090, Adapter, Multi Air Spring Compressor) tools.

    Connect and lock the four VVAA wire harness connectors.

  9. Connect and lock the oil temperature sensor wire harness connector.
    GC0200064Courtesy of CHRYSLER GROUP, LLC
  10. Check that the rocker arms (1) and the hydraulic lifters are assembled correctly.
    GC0200073Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Always refill the VVAA module with lubricant oil after fitting it on the engine in order to pass the test from cold the first time. Failure to fill the VVAA module with oil could result in operating problems.

  11. Refill the VVAA module lubrication circuit with the prescribed oil through the first valve (1), with a maximum pressure of 4 bar, taking care to avoid contact with the valve.
  12. Use the prescribed type SAE 0W-30 ACEA C2 / API SN in the VVAA module using a graduated syringe.
    NOTE:

    The oil quantity for the first filling is 420 cm3 (40° C).

  13. Wait 60 minutes before starting the engine to ensure that the engine valves are closed.
  14. Install the cylinder head cover. Refer to COVER(S), CYLINDER HEAD, REMOVAL AND INSTALLATION  .