Diagnostic Test
WARNING: This page is about a different variant/trim than selected.
- READ AND RECORD DTCS AND ENVIRONMENTAL DATA - ERASE DTCS AND CHECK FOR DTC TO RETURN WARNING:
On vehicles equipped with the high voltage system, you must thoroughly read and follow all High Voltage Safety procedures. In addition, before performing any diagnostic or service procedure near a high voltage component, you must perform the High Voltage Power Down. Failure to follow these instructions may result in possible serious or fatal injury.
Read the HIGH-VOLTAGE SAFETY PROCEDURES. Refer to: HIGH VOLTAGE SAFETY PROCEDURES .
When the HIGH-VOLTAGE POWER-DOWN PROCEDURE is necessary. Refer to: HIGH VOLTAGE POWER DOWN .
- With the scan tool, read DTCs in all Electronic Control Units (ECUs) and record on the repair order.
- For future reference, with the scan tool, run and save a vehicle Scan Report and all related recorded data.
- With the scan tool, erase all DTCs.
- Turn the ignition off for a minimum of 10.0 seconds.
- Turn the ignition on.
- Using the When Monitored and Set Conditions above and recorded data, operate the vehicle in the conditions that set the DTC.
- With the scan tool, read DTCs.
Did the DTC return?
Yes
- Go To 2
No
- Perform the appropriate INTERMITTENT CONDITION diagnostic procedure. Refer to TESTING FOR AN INTERMITTENT CONDITION .
- CHECK THE CHARGE PORT ACTUATOR POSITION SENSE AND LOCK CIRCUITS FOR AN OPEN OR HIGH RESISTANCE
- Turn the ignition off.
- Disconnect the PIM C2 harness connector.
- Measure the resistance of the (H451) Charge Port Unlock Switch Sense circuit between the PIM harness connector and the Electronic Vehicle Charging Port.
- Measure the resistance of the (H454) Charge Port Unlock Switch Sense circuit between the PIM harness connector and the Electronic Vehicle Charging Port.
- Measure the resistance of the (H453) Charge Port Lock Switch Sense circuit between the PIM harness connector and the Electronic Vehicle Charging Port.
- Measure the resistance of the (H452) Charge Port Door Unlock circuit between the PIM harness connector and the Electronic Vehicle Charging Port.
Is the resistance below 3.0 Ohms?
Yes
- Go To 3
No
- Repair the affected circuit(s) for an open or high resistance.
- Perform the Hybrid Control Processor (HCP) VERIFICATION TEST. Refer to HYBRID CONTROL PROCESSOR (HCP) VERIFICATION TEST .
- CHECK THE CHARGE PORT ACTUATOR POSITION SENSE AND LOCK CIRCUITS FOR A SHORT TO GROUND
- Check for continuity between ground and the (H451) Charge Port Unlock Switch Sense circuit at the PIM harness connector.
- Check for continuity between ground and the (H454) Charge Port Unlock Switch Sense circuit at the PIM harness connector.
- Check for continuity between ground and the (H453) Charge Port Lock Switch Sense circuit at the PIM harness connector.
- Check for continuity between ground and the (H452) Charge Port Door Unlock circuit at the PIM harness connector.
Is there a short to ground?
Yes
- Repair the affected circuit(s) for a short to ground.
- Perform the Hybrid Control Processor (HCP) VERIFICATION TEST. Refer to HYBRID CONTROL PROCESSOR (HCP) VERIFICATION TEST .
No
- Go To 4
- CHECK THE CHARGE PORT ACTUATOR POSITION SENSE CIRCUIT FOR A SHORT TO ANOTHER CIRCUIT
- Check for continuity between the (H451) Charge Port Unlock Switch Sense circuit and all other circuits at the PIM harness connector.
- Check for continuity between the (H454) Charge Port Unlock Switch Sense circuit and all other circuits at the PIM harness connector.
- Check for continuity between the (H453) Charge Port Lock Switch Sense circuit and all other circuits at the PIM harness connector.
- Check for continuity between the (H452) Charge Port Door Unlock circuit and all other circuits at the PIM harness connector.
Is there continuity between the any other circuit?
Yes
- Repair the affected circuit(s) for a short to another circuit.
- Perform the Hybrid Control Processor (HCP) VERIFICATION TEST. Refer to HYBRID CONTROL PROCESSOR (HCP) VERIFICATION TEST .
No
- Replace the Charge Port in accordance with the Service information.
- Perform the Hybrid Control Processor (HCP) VERIFICATION TEST. Refer to HYBRID CONTROL PROCESSOR (HCP) VERIFICATION TEST .