Diagnostic Test
WARNING: This page is about a different variant/trim than selected.
- READ AND RECORD DTCS - ERASE DTCS AND CHECK FOR DTC TO RETURN
- With the scan tool, read DTCs in all Electronic Control Units (ECUs) and record on the repair order.
- For future reference, with the scan tool, run and save a vehicle Scan Report and all related recorded data.
- With the scan tool, erase all DTCs.
- Turn the ignition off for a minimum of 75.0 seconds.
- Turn the ignition on.
- Using the When Monitored and Set Conditions above and recorded data, operate the vehicle in the conditions that set the DTC.
- With the scan tool, read DTCs.
Is the DTC Active or Pending?
Yes
- Go To 2
No
- Perform the appropriate INTERMITTENT CONDITION diagnostic procedure. Refer to INTERMITTENT DTC .
- ISOLATE AND CHECK THE FUEL QUANTITY SOLENOID (K365) CONTROL CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- The ignition must be off when checking the continuity of a circuit.
- Isolate the circuit by disconnecting the Electronic Control Unit (ECU) and the component harness connector containing the circuit being tested. Note: Use the wiring diagram as a guide to follow the path of the circuit.
- Before measuring the resistance of any circuit, first measure the resistance between the two leads of the DVOM. Note: The meter leads can add resistance to the measurement value.
- Connect one lead of the DVOM to the circuit being tested at the component harness connector.
Is the resistance below 3.0 Ohms?
Yes
- Go To 3
No
- Repair the circuit for an open or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to 3.0L, POWERTRAIN VERIFICATION TEST .
- ISOLATE AND CHECK THE FUEL QUANTITY SOLENOID (K366) 12-VOLT SUPPLY CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- The ignition must be off when checking the continuity of a circuit.
- Isolate the circuit by disconnecting the Electronic Control Unit (ECU) and the component harness connector containing the circuit being tested. Note: Use the wiring diagram as a guide to follow the path of the circuit.
- Before measuring the resistance of any circuit, first measure the resistance between the two leads of the DVOM. Note: The meter leads can add resistance to the measurement value.
- Connect one lead of the DVOM to the circuit being tested at the component harness connector.
Is the resistance below 3.0 Ohms?
Yes
- Go To 4
No
- Repair the circuit for an open or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to 3.0L, POWERTRAIN VERIFICATION TEST .
- REPLACE THE FUEL QUANTITY SOLENOID AND RETEST FOR DTCS
- Turn the ignition off.
- Replace the Fuel Quantity Solenoid in accordance with the Service Information.
- Connect the component and Electronic Control Unit (ECU) harness connectors.
- Turn the ignition on.
- With the scan tool, erase all DTCs.
- Turn the ignition off for a minimum of 10.0 seconds.
- Turn the ignition on.
- Using the When Monitored and Set Conditions above and recorded data, operate the vehicle in the conditions that set the DTC.
- With the scan tool, read DTCs.
Did the DTC return?
Yes
- Go To 5
No
- Replacing the faulty Fuel Quantity Solenoid repaired the fault.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to 3.0L, POWERTRAIN VERIFICATION TEST .
- CHECK RELATED PCM AND COMPONENT CONNECTIONS
- Disconnect all PCM harness connectors.
- Disconnect all related in-line harness connections (if equipped).
- Disconnect the related component harness connectors.
- Inspect harness connectors, component connectors, and all male and female terminals for the following conditions:
- Proper connector installation.
- Damaged connector locks.
- Corrosion.
- Other signs of water intrusion.
- Weather seal damage (if equipped).
- Bent terminals.
- Overheating due to a poor connection (terminal may be discolored due to excessive current draw).
- Terminals that have been pushed back into the connector cavity.
- Check for spread terminals and verify proper terminal tension.
Repair any conditions that are found.
- Connect all PCM harness connectors. Be certain that all harness connectors are fully seated and the connector locks are fully engaged.
- Connect all in-line harness connectors (if equipped). Be certain that all connectors are fully seated and the connector locks are fully engaged.
- Connect all related component harness connectors. Be certain that all connectors are fully seated and the connector locks are fully engaged.
- With the scan tool, erase DTCs.
- Test drive or operate the vehicle in accordance with the when monitored and set conditions.
- With the scan tool, read DTCs.
Did the DTC return?
Yes
- Replace and program the Powertrain Control Module (PCM) in accordance with the Service Information. Refer to MODULE, POWERTRAIN CONTROL (PCM), REMOVAL AND INSTALLATION .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to 3.0L, POWERTRAIN VERIFICATION TEST .
No
- Repair the poor connections.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to 3.0L, POWERTRAIN VERIFICATION TEST .