Removal And Installation: Installation
- Position the switch bank pod to the instrument panel center bezel.
- Install the fasteners to the back of the switch bank pod and tighten them securely.
- Install the instrument panel center bezel. Refer to BEZEL, INSTRUMENT PANEL, CENTER, REMOVAL AND INSTALLATION .
- Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.