Torque Specifications
WARNING: This page is about a different variant/trim than selected.
| DESCRIPTION | N. m | Ft. Lbs. | In. Lbs. | COMMENT |
|---|---|---|---|---|
| B+ Battery Positive at Power Distribution Center (PDC) | 8 | - | 71 | |
| Battery Negative to Negative Post | 7 | - | 62 | |
| Battery Positive Cable | 7 | - | 62 | |
| Battery Positive to Positive Post | 7 | - | 62 | |
| Battery Bracket Bolt - Battery Hold Down to Tray | 5 | - | 44 | |
| Battery Tray Bolts | 10 | - | 89 | |
| Intelligent Battery Sensor (IBS) Sensor to Negative Post | 5 | - | 44 | |
| Negative Battery Cable to the IBS | 7 | - | 62 | |
| Battery Negative Lead to Fender | 20 | 15 | - | |
| Negative Battery Cable to Engine Block | 20 | 15 | - | |
| Negative Battery Cable to Engine Block 5.7L | 41 | 30 | - | |
| PDC to Wiring Connector | 4 | - | 35 | |
| PDC to B+ | 12 | 9 | - | |
| PDC Tray To Cross Beam Nuts |
8 | - | 71 |