Removal And Installation: Installation
WARNING: This page is about a different car, the 2020 Jeep Renegade. However, it is still accessible from the selected car via links, so may be relevant.
- Position the LTE2 antenna on to the studs on the instrument panel carrier, install the fasteners securing the LTE2 antenna to the instrument panel carrier and tighten securely.
- Connect the wire harness connector to the LTE2 antenna.
- Position the carrier bracket to the instrument panel carrier.
- Install the fasteners that retain the carrier reinforcement bracket and tighten them securely.
- Install the steering column. Refer to INSTALLATION, INSTALLATION .
- Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.