LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2018 >> Grand Cherokee Laredo, RWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 3 (8HP70 Automatic Transmission (Service Information)) >> Cable, Manual Park Release >> Installation >> Lower

Cable, Manual Park Release: Installation: Lower

WARNING: This page is about a different variant/trim than selected.
  1. Remove the shifter bezel.
  2. Remove the center console left side panel.
    GC0158433Courtesy of CHRYSLER GROUP, LLC
  3. Route the Manual Park Release (MPR) cable though the access hole in the body. Seat the grommet (1) in the body.
  4. Raise and support the vehicle. Refer to HOISTING, STANDARD PROCEDURE .
    NOTE:

    Be sure that the cable grommet (1) is seated in position from the under body side.

    GC0158322Courtesy of CHRYSLER GROUP, LLC
  5. Install the MPR cable (2) into the bracket (3) and lock it in place.
  6. Install the MPR cable onto the lever ball stud.
  7. Lower the vehicle.
    GC0158443Courtesy of CHRYSLER GROUP, LLC
  8. Attach the upper (2) and lower (4) cables to the junction (3).
    GC0158398Courtesy of CHRYSLER GROUP, LLC
  9. Close and secure the junction cover (1).
  10. Install the left side center console bezel.
  11. Install the shifter bezel.
  12. Verify operation of the MPR.